Installation
24
ELECTRICAL CONNECTIONS
The electrical system of
MONOLITE GT
Boilers must be built by an Authorised Company that must refer to the wiring diagrams
supplied with the Boiler, with the control panel and with the burner. Moreover, it must operate in compliance with the Technical
Standards and the national and local Laws in force.
Once the work is complete, the Authorised Company must issue the
Declaration of Conformity
of the system built.
m
IMPORTANT
It is mandatory to:
–
use an omnipolar thermal-magnetic line circuit breaker complying with the Standards CEI-EN (contact opening of at
least 3 mm)
–
observe the connection L (Phase) - N (Neutral). Keep the earth conductor longer than the power supply conductors by
approximately 2 cm
–
connect the earth cable to an effective earthing system.
ICI Caldaie S.p.A.
is not liable for any damage caused by the
lack of the earthing system and the failure to comply with the instructions of the wiring diagrams.
d
PROHIBITION
Do not use the water and heating system pipes for the
earthing connections
.