Residual Risk Management
29
MINIMUM TEMPERATURE
–
Make sure that the temperature the boiler can be subjected to complies to the design minimum permitted temperature.
EARTHQUAKE
–
The appliance has not been dimensioned for installation in an earthquake zone
ATMOSPHERIC CONDITIONS
–
Protect the generator against adverse climatic conditions.
INSTALLATION AND START-UP
–
Make sure that hydraulic connections are duly joined together
–
Check the correct connection of electric parts
–
Perform a correct chimney fastening
–
Check boiler correct operation
–
The boiler must be operated at reduced power (max 50%) until reaching the water operating temperature in order to avoid
thermal shocks and thermal expansions between the various parts of the body.
FAILING TO CARRY OUT MAINTENANCE
–
Carry out a periodical preventive maintenance and any component repair or replacement operations according to
the indications set forth in the Technical Manual and, anyway, for the cases not provided for in the manual, consult the
manufacturer of the generator.
POOR STORAGE
–
The appliance must be stored according to the indications given in the Technical Manual (Wet storage and Dry storage)
–
The boiler body must be protected against adverse climatic conditions (minimum temperature -10 °C) and rain effects
PRESSURISED BODY REPAIR
–
To carry out repair operations, contact the manufacturer and/or the Body responsible for the check of operating steam
generator (technical and bureaucratic details), and use suitable means and materials
DOWNGRADE AND CHANGE OF USE
–
Boiler downgrade and change of use through preventive authorisation by the relevant bodies.
–
The manufacturer shall not be held liable in the event of accidents caused by incorrect decommissioning.
HANDLING
–
During handling, always stay at a distance of at least 5 metres from boiler projection to the ground
–
After any impact with the ground, visually inspect generator to make sure that all its parts are intact; perform the hydraulic
test once again
–
Always handle the generator in compliance with the indications set forth in the manual
FIRE
–
The plant room must be arranged in compliance with the fire protection regulations in force in the country of installation
–
Check that body and accessories are intact and not damaged after the fire
DECOMMISSIONING
–
Boiler decommissioning through prior notification to the competent authorities
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz