Check the ice thickness.
Older under counter models used a dual float system, whereby the ice thickness was
changed with the high-water level float sensor. This float can be adjusted upward for a
thicker bridge and lower for a thinner bridge.
Part of the installation process is to check that the ice thickness is properly adjusted.
Too close to the evaporator and the customer will have hollow cubes. Too far from the
evaporator and you’re freeze time will be too long and the customer will complain of
“thick” or “chunky” ice.
Pre-Start Up Tips
10
Summary of Contents for IC Series
Page 1: ...Under Counter Installation Service Manual IC Series IU Series...
Page 2: ...2 Under Counter Spec Sheet...
Page 3: ...3 Under Counter Spec Sheet...
Page 23: ...Lamp Indicators Under Counter 23...
Page 24: ...24 Under Counter Wiring Diagram...
Page 25: ...25 Under Counter PCB...
Page 26: ...26 Under Counter PCB...
Page 29: ...29 Under Counter PCB UnderCounterFlushTimeAdjustment...
Page 30: ...30 Under Counter Refrigeration Circuit...
Page 31: ...31 Under Counter Refrigeration Circuit...
Page 32: ...32 Under Counter P T Chart Cycle Times...
Page 33: ...33 Under Counter Service Tips Pinching Tubing Re rounding Tubing...
Page 37: ...THANK YOU 1 15 2022...