Operation of Wet & Dry Vacuum
4
ICE iW90
OPERATOR
Read operators manual thoroughly prior to operating or servicing
this machine.
Be sure that the handle is properly assembled on machine body prior to
operating .
Wet Operation
1) Remove clear window and remove the cloth or paper filter form vacuum.
2) While clear window is removed, check to make sure that the float shut-off is
unobstructed and fully functional.
3) Replace clear window on the top of the recovery tank.
4) Connect vacuum hose to inlet on the machine body.
5) Attach appropriate accessory tool for the job to be completed.
6) Make sure the Main Power Switch is in the OFF position, then plug power
cord into a grounded outlet.
Do not use an extension cord in conjunction with the standard power cord.
7) If using the front-mounted squeegee assembly, be sure that squeegee is
attached to front of machine.
8) If using the front-mounted squeegee assembly, lower squeegee to the floor
by depressing the left half of the pedal [rear of the machine] forward with your
foot.
9) Turn power switch to “on” position.
10) During wet pickup, the float shut-off will automatically prevent water from
entering the recovery tank once the recovery tank is full.
If foam develops in the recovery tank during wet vacuuming, use de-
foamer chemical to help eliminate the foam. Foam will not activate the float
shut-off, and therefore, may cause vacuum motor damage.
11) To raise the squeegee assembly back to transport position, depress the
right half of the pedal (rear of the machine) downward with your foot.
Dry Operation
1) If the machine has been used for wet pick-up, empty the Recovery Tank,
rinse it out and dry it completely and install the Dry Container System. DO NOT
use the machine for dry pick-up without the Dry Container System in place.
2) Remove clear window, and be sure the cloth or paper filter is properly
installed.
Summary of Contents for iW90
Page 8: ...ICE iW90 7 OPERATOR ...
Page 11: ...10 ICE iW90 OPERATOR ...