GEM Models A/W
Operation: Water
Page
16
Water enters the machine through the 3/8 inch male flare at the rear of the cabinet, goes to the water reservoir
which it enters through the float valve. The water then goes out the bottom of the reservoir tank to the bottom
of the evaporator. Reservoir overflow or evaporator condensation is routed to the drain.
Water cooled models have a separate water circuit for the cooling water. The water enters at the rear, goes to
the water regulating valve, then to the water cooled condenser and down the drain.
Water System
Water Inlet
Water Level
Evaporator Water Inlet
Ice Chute
Evaporator Drain
Drain
Reservoir
Summary of Contents for GEM1856
Page 2: ......
Page 8: ...GEM Models A W For The Installer Page 2 GEM0650 0655 0956 0955 A W ...
Page 9: ...GEM Models A W For The Installer Page 3 GEM1256A W ...
Page 40: ...GEM Models A W Wiring Diagram Page 34 Wiring Diagram GEM0650 A W ...
Page 41: ...GEM Models A W Wiring Diagram Page 35 Wiring Diagram GEM0956 A W GEM1256A W ...
Page 42: ...GEM Models A W Wiring Diagram Page 36 Wiring Diagram GEM0655 A W GEM0955 A W ...
Page 43: ...GEM Models A W Wiring Diagram Page 37 Wiring Diagram GEM1856 Air ...
Page 44: ...GEM Models A W Wiring Diagram Page 38 Wiring Diagram GEM1855 Air ...