external cables. This enables the diagnostics to verify the serializer or deserializer
interface, as well as the attached SFP and cable.
All diagnostic tests are run at link speeds of 1 Gbps and 2 Gbps. As a result, the
transmit and receive speed of the links can be temporarily locked at one speed or
the other while the diagnostic tests are running. For information about the specific
diagnostic tests and how to run them, see the Brocade Diagnostic and System
Error Message Reference.
30
IBM TotalStorage SAN Switch: 3534 Model F08 Installation and User’s Guide
Summary of Contents for TotalStorage 3534-F08
Page 2: ......
Page 3: ...IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide GC26 7559 00...
Page 8: ...vi IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 10: ...viii IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 12: ...x IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 18: ...xvi IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 22: ...xx IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 62: ...40 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 82: ...60 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 94: ...72 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 100: ...78 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 103: ......
Page 104: ...Part Number 17P7301 Printed in U S A GC26 7559 00 1P P N 17P7301...
Page 105: ...Spine information IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...