a.
Port 2
5
of the upper canister, control enclosure, attaches to Port 1
6
of
the upper canister, expansion enclosure 2.
b.
Port 2
7
of the lower canister, control enclosure, attaches to Port 1
8
of
the lower canister, expansion enclosure 2. The port locations on the lower
canister are inverted from the port locations on the upper canister. Port 1 on
the lower canister is opposite port 1 on the upper canister.
Note:
The connecting sequence from port 2 of the node canister is called
chain 2.
4.
Attach the SAS cables from the first expansion enclosure to the third expansion
enclosure.
Control enclosure
Expansion enclosure 1
2
Expansion enclosure 2
6
8
4
svc00660
1
5
3
7
Figure 35. Adding a second expansion enclosure
Chapter 2. Performing the hardware installation
47
Summary of Contents for Storwize V7000
Page 1: ...IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide GC27 5945 01...
Page 20: ...xx IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide...
Page 48: ...28 IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide...
Page 82: ...62 IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide...
Page 92: ...72 IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide...
Page 100: ...80 IBM Storwize V7000 Unified Model 2073 720 Quick Installation Guide...
Page 101: ......
Page 102: ...Part Number 00AR284 Printed in USA GC27 5945 01 1P P N 00AR284...