Table 23. Site Planning Checklist (continued)
Task No.
Planning Activity
Verified By
Time
Date
5
Cable and interface
equipment evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment
(transceivers)
6
Electromagnetic interference
(EMI) evaluation:
• Distance limitations for
signaling
• Site wiring
• RFI
3
levels
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
3. RFI = radio frequency interference.
Contact and Site Information
Use the following worksheet to record contact and site information:
Table 24. Contact and Site Information
Contact person
Contact phone
Contact E-Mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State
Zip code
Country
Chassis and Network Information
Use the following worksheet to record chassis and network information:
Contract Number :
Chassis Serial Number:
52 IBM Storage Networking: IBM Storage Networking SAN48C-6 32 Gbps 48-Port Fibre Channel Switch
Installation, Service, and User Guide