4.
Loosen the wing nuts (
1
and
2
) on both rail assemblies and adjust the rail
size to the depth of your rack. After you adjust the depth, tighten the wing
nuts as much as possible while still allowing some movement.
Refer to Figure 9 for information about how to tighten or loosen wing nuts and
achieve a desired rail depth.
Wing nut
1
Wing nut
2
5.
Select the holes in the rail where you want to position the uninterruptible
power supply.
The figure shows the rear rail where the 2145 UPS-1U attaches to the rack. See
Figure 10 on page 19.
Note:
The bottom flange of the support rail must align with the EIA mark on
the rack.
svc00742
LD2
LD2
LD1
2
1
Figure 8. Installing the 2145 UPS-1U mounting brackets for the 2145 UPS-1U
Front
Rear
svc00737
2
1
Figure 9. Adjusting the rail depth on the 2145 UPS-1U
18
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...