Store the shipping bracket if you want to move your system at a later date.
2.
Cable the server.
a.
Plug the top two power cords into the power supply and attach the cables to the handles on the
power supply with cable ties or hook-and-loop fasteners.
Figure 18. Removing the shipping bracket from the rear of the chassis
Installing the IBM Power System S824 (8286-42A)
23
Summary of Contents for Power Systems 8286-42A
Page 1: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM ...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM ...
Page 6: ...iv Power Systems Installing the IBM Power System S824 8286 42A ...
Page 16: ...xiv Power Systems Installing the IBM Power System S824 8286 42A ...
Page 50: ...34 Power Systems Installing the IBM Power System S824 8286 42A ...
Page 62: ...46 Power Systems Installing the IBM Power System S824 8286 42A ...
Page 63: ......
Page 64: ...IBM Part Number 01LK523 Printed in USA GI11 9905 06 1P P N 01LK523 ...