4.
Attach the cable-management stop bracket (B) to the slot on the inside of the left slide by sliding the
stop bracket (B) into the slide rail until the spring-loaded pin snaps into place. For details, see
Figure 12.
5.
Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For
details, see Figure 13 on page 10.
Figure 11. Securing the cable-management stop bracket to the support arm
Figure 12. Extending the pin, and installing the bracket into the slide rail
Installing the IBM Power System S824 (8286-42A)
9
Summary of Contents for Power Systems 8286-42A
Page 1: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM ...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM ...
Page 6: ...iv Power Systems Installing the IBM Power System S824 8286 42A ...
Page 16: ...xiv Power Systems Installing the IBM Power System S824 8286 42A ...
Page 50: ...34 Power Systems Installing the IBM Power System S824 8286 42A ...
Page 62: ...46 Power Systems Installing the IBM Power System S824 8286 42A ...
Page 63: ......
Page 64: ...IBM Part Number 01LK523 Printed in USA GI11 9905 06 1P P N 01LK523 ...