background image

Attention: Operating the system without the service access cover on for more than 10 minutes

when the system power is turned on might damage the system components.

Figure 32. Removing the service access cover

Permanently removing an NVMe U.2 pass-thru card from the 9009-22G or

9223-22S system

To permanently remove an NVMe pass-thru card from the system, complete the steps in this procedure.

Procedure

1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged

into a ground jack or connected to an unpainted metal surface. If not, do so now.

2. Lift each air baffle (A) straight up.

See Figure 33 on page 40.
Place air baffles upside down on a clean area. When you turn an air baffle over, hold the detachable

drive cover to prevent it from coming loose.

NVMe U.2 pass-thru card for the 9009-22G or 9223-22S  39

Summary of Contents for Power System 9009-22G

Page 1: ...Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S IBM...

Page 2: ...al G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER9 processor and to all associated models Copyright Inter...

Page 3: ...or 9223 22S system 26 Preparing the 9009 22G or 9223 22S system for operation after removing and replacing an NVMe U 2 pass thru card 30 Permanently removing an NVMe U 2 pass thru card from the 9009...

Page 4: ...iv...

Page 5: ...erordnung geeignet Laser safety information IBM servers can use I O cards or features that are fiber optic based and that utilize lasers or LEDs Laser compliance IBM servers may be installed inside or...

Page 6: ...ttach the power cords to the outlets 5 For racks with a DC power distribution panel PDP restore the power from the Customer s DC power source and turn on the circuit breakers located in the PDP 6 Turn...

Page 7: ...mpromise the supply wiring or overcurrent protection To provide the correct power connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requ...

Page 8: ...lete the following steps Lower the four leveling pads Install stabilizer brackets on the rack cabinet or in an earthquake environment bolt the rack to the floor If you removed any devices from the rac...

Page 9: ...not put any load on the slide rail mounted equipment mounted in the installation position Do not leave the slide rail mounted equipment in the installation position L002 L003 or or or or Safety notice...

Page 10: ...s 1 laser product Consult the label on each part for laser certification numbers and approval information CAUTION This product might contain one or more of the following devices CD ROM drive DVD ROM d...

Page 11: ...d for use to assist lift install remove units load up into rack elevations It is not to be used loaded transporting over major ramps nor as a replacement for such designated tools like pallet jacks wa...

Page 12: ...e A winch accident could cause serious injury Not for moving humans Make certain clicking sound is heard as the equipment is being raised Be sure winch is locked in position before releasing handle Re...

Page 13: ...d DC return DC I design The DC battery return terminal shall not be connected to the chassis or frame ground The dc powered system is intended to be installed in a common bonding network CBN as descri...

Page 14: ...xiv Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...

Page 15: ...ures to install an NVMe U 2 pass thru card Preparing the 9009 22G or 9223 22S system to install an NVMe U 2 pass thru card To prepare the system to install an NVMe U 2 pass thru card complete the step...

Page 16: ...Figure 1 Removing the power cords L003 or or 2 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...

Page 17: ...ords The product might be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 NVMe U 2 pass thru card fo...

Page 18: ...ement arms Ensure that the cable management arms can move freely Ensure that the cables at the rear of the system do not catch or bind as you pull the system unit into the service position Do not pull...

Page 19: ...decrease your risk of receiving electric shock when using or working on electrical equipment If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and installing...

Page 20: ...in the system complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to a...

Page 21: ...in filler and air divider by completing the following steps a Rotate the top of the clip in filler until the bottom hook unclasps from the air screen b Lift the clip in filler out of the system NVMe...

Page 22: ...Figure 5 Removing the clip in filler c Lift the air divider up as shown in the following figure 8 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...

Page 23: ...air divider for a future use 4 Plug the NVMe cable into the connector port J1 of the new or replacement NVMe U 2 pass thru card Push the connector in until the connector latch clicks See the followin...

Page 24: ...ollowing figure Figure 8 Connecting the NVMe cable for a system with one NVMe U 2 pass thru card in P1 C49 and a filler in slot P1 C50 If you have two NVMe U 2 pass thru cards one is installed in slot...

Page 25: ...Me U 2 pass thru card complete the following steps a Route the NVMe cable into position while you lower the NVMe U 2 pass thru card into its slot b Push the NVMe U 2 pass thru card down to seat the ca...

Page 26: ...the NVMe U 2 pass thru card 6 Connect the NVMe cable to the port on the NVMe drive backplane Push the connector in until the connector latch clicks 12 Power Systems NVMe U 2 pass thru cards for the 90...

Page 27: ...ve backplane 7 Replace each air baffle A straight down into the chassis See Figure 12 on page 14 When an air baffle is upside down hold the detachable drive cover to prevent it from coming loose NVMe...

Page 28: ...plete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal...

Page 29: ...safety latches A by pushing them inward Ensure that the cable management arms can move freely Ensure that the cables at the rear of the unit do not catch or bind as you push the unit into the operati...

Page 30: ...the cable management arm with hook and loop fasteners around the back side of the cable management arm but not around the cables 6 Using your labels reconnect the power cords A to the system unit Fast...

Page 31: ...ying a repair www ibm com support knowledgecenter POWER9 p9ect pxect_verifyrepair htm If you installed the part for any other reason verify the installed part For instructions see Verifying the instal...

Page 32: ...prepare the system to remove and replace an NVMe U 2 pass thru card complete the steps in this procedure Procedure 1 Identify the part and the system that you are working on For instructions see Iden...

Page 33: ...Figure 16 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 19...

Page 34: ...product might be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 20 Power Systems NVMe U 2 pass thr...

Page 35: ...e management arms Ensure that the cable management arms can move freely Ensure that the cables at the rear of the system do not catch or bind as you pull the system unit into the service position Do n...

Page 36: ...e your risk of receiving electric shock when using or working on electrical equipment If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and installing or repl...

Page 37: ...rd from the system complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected...

Page 38: ...ete the following steps a Twist the screws A counterclockwise to release the NVMe U 2 pass thru card b Lift both the NVMe U 2 pass thru card and the NVMe cable out of the slot as shown in the followin...

Page 39: ...2 pass thru card 4 Disconnect the NVMe cable from the NVMe U 2 pass thru card See the following figure Figure 21 Disconnecting the NVMe cable from the NVMe U 2 pass thru card NVMe U 2 pass thru card f...

Page 40: ...ed metal surface If not do so now 2 Plug the NVMe cable into the connector port J1 of the new or replacement NVMe U 2 pass thru card Push the connector in until the connector latch clicks See the foll...

Page 41: ...lot P1 C49 and the other one is installed in slot P1 C50 One NVMe cable connects from port J1 on the NVMe drive backplane to port J1 on the NVMe U 2 pass thru card in slot P1 C49 One NVMe cable connec...

Page 42: ...pass thru card complete the following steps a Route the NVMe cable into position while you lower the NVMe U 2 pass thru card into its slot b Push the NVMe U 2 pass thru card down to seat the card c Pu...

Page 43: ...ard 4 Replace each air baffle A straight down into the chassis See Figure 26 on page 30 When an air baffle is upside down hold the detachable drive cover to prevent it from coming loose NVMe U 2 pass...

Page 44: ...hru card complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unp...

Page 45: ...safety latches A by pushing them inward Ensure that the cable management arms can move freely Ensure that the cables at the rear of the unit do not catch or bind as you push the unit into the operati...

Page 46: ...the cable management arm with hook and loop fasteners around the back side of the cable management arm but not around the cables 6 Using your labels reconnect the power cords A to the system unit Fast...

Page 47: ...turn_off_identify_led htm 9 Verify the installed part If you replaced the part because of a service action verify the installed part For instructions see Verifying a repair www ibm com support knowled...

Page 48: ...prepare the system to permanently remove an NVMe U 2 pass thru card complete the steps in this procedure Procedure 1 Identify the part and the system that you are working on For instructions see Iden...

Page 49: ...Figure 30 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 35...

Page 50: ...product might be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 36 Power Systems NVMe U 2 pass thr...

Page 51: ...e management arms Ensure that the cable management arms can move freely Ensure that the cables at the rear of the system do not catch or bind as you pull the system unit into the service position Do n...

Page 52: ...e your risk of receiving electric shock when using or working on electrical equipment If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and installing or repl...

Page 53: ...pass thru card from the system complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack...

Page 54: ...you want to permanently remove 4 Press the connector latch and unplug the NVMe cable that is connected to the NVMe drive backplane Leave the other end of the cable connected to the NVMe U 2 pass thru...

Page 55: ...2 pass thru card complete the following steps a Twist the screws A counterclockwise to release the NVMe U 2 pass thru card b Lift both the NVMe U 2 pass thru card and the NVMe cable out of the slot as...

Page 56: ...hru card 6 Disconnect the NVMe cable from the NVMe U 2 pass thru card See the following figure Figure 36 Disconnecting the NVMe cable from the NVMe U 2 pass thru card 42 Power Systems NVMe U 2 pass th...

Page 57: ...ller and air divider a Align the clip in filler over the empty SAS slot b Rotate the top of the clip in filler until the bottom hook clips onto the air screen Figure 37 Installing the clip in filler c...

Page 58: ...e each air baffle A straight down into the chassis See Figure 39 on page 45 When an air baffle is upside down hold the detachable drive cover to prevent it from coming loose 44 Power Systems NVMe U 2...

Page 59: ...pass thru card complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to...

Page 60: ...latches A by pushing them inward Ensure that the cable management arms can move freely Ensure that the cables at the rear of the unit do not catch or bind as you push the unit into the operating posi...

Page 61: ...Secure the cable management arm with hook and loop fasteners around the back side of the cable management arm but not around the cables 6 Using your labels reconnect the power cords A to the system u...

Page 62: ...service action verify the installed part For instructions see Verifying a repair www ibm com support knowledgecenter POWER9 p9ect pxect_verifyrepair htm If you installed the part for any other reason...

Page 63: ...heck the amount of remaining life in NVMe devices www ibm com support knowledgecenter POWER9 p9hak pxhak_nvme_remaining_life_linux htm Related information Removing an operational NVMe device from an I...

Page 64: ...50 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...

Page 65: ...oduct s and or the program s described in this publication at any time without notice Any references in this information to non IBM websites are provided for convenience only and do not in any manner...

Page 66: ...ersonally identifiable information is collected by the Software Offerings Some of our Software Offerings can help enable you to collect personally identifiable information If this Software Offering us...

Page 67: ...Klasse A ein Um dieses sicherzustellen sind die Ger te wie in den Handb chern beschrieben zu installieren und zu betreiben Des Weiteren d rfen auch nur von der IBM empfohlene Kabel angeschlossen werde...

Page 68: ...Information Technology Industries Association JEITA Notice This statement applies to products less than or equal to 20 A per phase This statement applies to products greater than 20 A single phase Thi...

Page 69: ...ial area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be use...

Page 70: ...in den EU Mitgliedsstaatenund h lt die Grenzwerte der EN 55022 EN 55032 Klasse B ein Um dieses sicherzustellen sind die Ger te wie in den Handb chern beschrieben zu installieren und zu betreiben Des...

Page 71: ...ectronics and Information Technology Industries Association JEITA Notice This statement applies to products less than or equal to 20 A per phase This statement applies to products greater than 20 A si...

Page 72: ...ent Unauthorized changes or modifications could void the user s authority to operate the equipment This device complies with Part 15 of the FCC rules Operation is subject to the following two conditio...

Page 73: ...export or re export this information except in full compliance with all applicable laws and regulations including all United States export laws and regulations IBM MAKES NO GUARANTEE ABOUT THE CONTENT...

Page 74: ...60 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...

Page 75: ......

Page 76: ...IBM...

Reviews: