Figure 24. Connecting the NVMe cable for a system with two NVMe U.2 pass-thru cards in slot
P1-C49 and slot P1-C50
3. To install or replace the NVMe U.2 pass-thru card, complete the following steps:
a) Route the NVMe cable into position while you lower the NVMe U.2 pass-thru card into its slot.
b) Push the NVMe U.2 pass-thru card down to seat the card.
c) Push in and twist the screws (A) clockwise to fully seat the NVMe U.2 pass-thru card.
28 Power Systems: NVMe U.2 pass-thru cards for the 9009-22G or 9223-22S
Summary of Contents for Power System 9009-22G
Page 1: ...Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 64: ...50 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 74: ...60 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 75: ......
Page 76: ...IBM...