2)
Use the 21+11 sequences, if it returns A6C3500C. This indicates that settings have been saved
successfully. If not, repeat function 11 until it returns A6C3500C.
f.
Enable and set the console adapter location. Select the console adapter location - external PCI card.
1)
Use the 65-21+11 sequences until it returns A6E2500B. Use the 21+11 sequence, if it returns
A6E2500C. This indicates that the add-on adapter has been enabled and the settings have been
saved successfully. If not, repeat function 11 until it returns A6E2500C.
2)
Use the 65-21+11 sequences until it returns A6D1500B. Use the 21+11 sequence, if it returns
A6D1500C. This indicates that the internal embedded port has been disabled and the settings
have been saved successfully. If not, repeat function 11 until it returns A6D1500C.
3)
Use the 65-21+11 sequences until it returns A6Bn500B. This indicates that the LAN Adapter will
be enabled in location Cn, where n= the location code of the "Console adapter location". Use
the 21+11 sequence, if it returns A6Bn500C the settings have been saved successfully.
Table 9. Console settings and functions
Console Setting
Function
E2
Enable add-on adapter (OPSCONSOLE ENBEXTLAN)
D1
Disable embedded port (OPSCONSOLE DISINTLAN)
Bn
Enable LAN adapter in slot Cn (OPSCONSOLE
ENBLSLOT n)
Note:
This setting requires that the embedded (internal)
LAN flag is turned off and the external flag is turned on.
Otherwise, you will not see this series.
Notes:
1)
Use the earlier recorded slot number to determine which Bn function must be selected. For
example, if you are using the I/O adapter in slot C2, you can select console setting B2 to
configure the location of the adapter.
2)
The Bn might advance from search order rather then numerically. For example, if the search
order is C4,C3,C1, the Bn numbers might display 4 before another lower number. This is
determined by the model, and not all models are affected.
3)
If A60x500D is displayed, function has timed out because the function has been entered
slowly). You have a minute to complete a 65-21-11 sequence. After you start, select the required
settings with no pauses.
9.
Connect the console by completing the following steps:
a.
Monitor the console status. After the status changes to
Pending Authorization
, the Service Tools
Sign-On window opens.
Note:
The Service Tools Sign-On window might open behind the Operations Console window.
Resize or move the Operations Console window to locate the Service Tools Sign-On window.
b.
Sign on to the Service Tools application. To sign on to the Service Tools application, enter
11111111
for the user ID and password.
c.
Load the initial program and configure the system.
d.
If your session does not connect, wait for the power-on process to stop on an attention or IPL
failure system reference code (SRC), such as A6005008 or B2xxxx. If the power-on stops at
A6005008, call your IBM service provider for assistance.
Note:
You must configure and start an IBM i TCP interface on a second port (T2, T3, T4) before
moving the console. This action ensures that there is an alternative method to access the server.
Reset the PC to its original TCP/IP settings.
Installing the IBM Power System S812 (8284-21A)
29
Summary of Contents for Power System 8284-21A
Page 1: ...Power Systems Installing the IBM Power System S812 8284 21A GI11 9925 00 IBM ...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S812 8284 21A GI11 9925 00 IBM ...
Page 6: ...iv Power Systems Installing the IBM Power System S812 8284 21A ...
Page 16: ...xiv Power Systems Installing the IBM Power System S812 8284 21A ...
Page 60: ...44 Power Systems Installing the IBM Power System S812 8284 21A ...
Page 61: ......
Page 62: ...IBM Part Number 01LK518 Printed in USA GI11 9925 00 1P P N 01LK518 ...