4
P
UTTING
Y
OUR
ATM N
ETWORK
T
OGETHER
Planning Your Network 4-1
ATM Configuration Rules 4-2
Extending VLANs Through the ATM Network 4-2
ATM Connections Within Your Network 4-3
5
N
ETWORK
C
ONFIGURATION
E
XAMPLES
ATM Backbone in the Building 5-1
Campus Configuration 5-2
Making a Building Resilient to Network Failure 5-4
6
I
NSTALLING
AND
S
ETTING
U
P
THE
M
ODULE
Following Safety Information 6-1
Device Support 6-3
Pre-installation Procedure 6-3
Check the Power Supply 6-3
Installation 6-4
Connecting a cable to the ATM Port 6-5
Powering Up the Switch 6-5
Power On Self Test (POST) 6-5
Post-Installation Checks 6-5
LED Summary 6-6
Checking the Power Supply 6-7
Checking that the ATM Module is Installed Correctly 6-7
Checking the Physical Connections 6-7
7
A
CCESSING
M
ANAGEMENT
F
EATURES
Screen Map 7-1
Keyboard Shortcuts 7-1
Correcting Text Entry 7-1
Logging On 7-3
Logging Off 7-4
Automatic Logout 7-4
8
M
ANAGING
THE
ATM M
ODULE
Configuring an ATM Port 8-2
Extending VLANs into the ATM Network 8-4
Displaying all VLANs 8-5
ATM Port Setup 8-6
Mapping Far End MAC Addresses 8-8
Creating a MAC Address to ATM Entry 8-9
Finding an Address Entry 8-10
Updating Address Entries 8-10
Deleting an Address Entry 8-10
Displaying an ATM Connection 8-10
Finding an ATM Connection 8-11
Updating Address Entries 8-11
Setting Up Resilient Links 8-11
Upgrading Software 8-12
Error Messages 8-13
Status Messages 8-14
9
M
ONITORING
THE
ATM M
ODULE
Statistics Overview 9-2
ATM Port Statistics 9-3
ATM VLAN LEC Status 9-5
ATM Physical Layer Statistics 9-10
Using Physical Layer Statistics to Troubleshoot 9-12
Summary of Contents for OPTIONS ATM OC-3c
Page 1: ...8271 Nways Ethernet LAN Switch ATM OC 3c Module User s Guide...
Page 6: ......
Page 10: ...4 ABOUT THIS GUIDE...
Page 23: ...Asynchronous Transfer Mode ATM Layer 2 11 Figure 2 7 Switching Cells using VPI and VCI values...
Page 28: ...2 16 CHAPTER 2 NETWORK LAYER CONCEPTS...
Page 31: ...Extending VLANs into the ATM Network 3 3 Figure 3 3 Extending VLANs into the ATM Network...
Page 32: ...3 4 CHAPTER 3 VIRTUAL LAN CONCEPTS...
Page 39: ...Campus Configuration 5 3 Figure 5 2 Campus and Cost Sensitive Network...
Page 50: ...7 2 CHAPTER 7 ACCESSING MANAGEMENT FEATURES Figure 7 1 Screen Map...
Page 80: ...9 14 CHAPTER 9 MONITORING THE ATM MODULE...
Page 87: ...Safety Notices A 7 IEC 950 SELV SELV...
Page 88: ...A 8 APPENDIX A SAFETY INFORMATION...
Page 90: ...B 2 APPENDIX B SCREEN ACCESS RIGHTS...
Page 94: ...C 4 APPENDIX C ATM MODULE TECHNICAL SPECIFICATIONS...
Page 98: ...D 4 APPENDIX D TROUBLESHOOTING Figure D 1 Troubleshooting Flow Diagram...
Page 120: ...E 2 APPENDIX E TECHNICAL SUPPORT AND SERVICE...
Page 136: ...2 BIBLIOGRAPHY...
Page 140: ...4 INDEX...