18
IBM® Netfinity® 7600 Installation Guide
Reset button:
Press this button to reset the server and run the power-on self-test
(POST).
Power control button:
Press this button to manually turn on or off the server.
You can start the server in several ways:
— You can turn on the server by pressing the Power Control button on the
front of the server.
Note:
After you plug the power cords of your server into electrical outlets,
wait 20 seconds before pressing the Power Control button. During
this time the system-management processor is initializing and the
Power Control button does not respond.
— If the server is turned on, a power failure occurs, and unattended-start mode
is enabled in the Configuration/Setup utility program, the server will start
automatically when power is restored.
— If AC power is present, the server is off, and the wake-up feature is enabled
in the Configuration/Setup utility program, the wake-up feature will turn
on the server at the set time.
— If AC power is present, the server is off, and ring-signal detect is enabled in
the Configuration/Setup utility program, you can turn on the server by
telephone input.
— The Netfinity Advanced System Management Processor also can turn on the
server.
You can turn off the server in several ways:
— You can turn off the server by pressing the Power Control button on the
front of the server. Pressing the Power Control button starts an orderly
shutdown of the operating system, if this feature is supported by your
operating system, and places the server in standby mode.
Summary of Contents for Netfinity 7100
Page 1: ...IBM IBM Netfinity 7600 Installation Guide SC09 N821 60 ...
Page 4: ...IBM Netfinity 7600 Installation Guide ...
Page 16: ...6 IBM Netfinity 7600 Installation Guide ...
Page 40: ...30 IBM Netfinity 7600 Installation Guide Troubleshooting chart ...
Page 56: ...46 IBM Netfinity 7600 Installation Guide ...
Page 58: ...48 IBM Netfinity 7600 Installation Guide ...
Page 59: ......