background image

WARNING:

Do not look directly into a fiber-optic transceiver or into the ends of

fiber-optic cables. Fiber-optic transceivers and fiber-optic cable connected to a
transceiver emit laser light that can damage your eyes.

CAUTION:

Do not leave a fiber-optic transceiver uncovered except when inserting

or removing cable. The safety cap keeps the port clean and prevents accidental
exposure to laser light.

3.

Insert the cable connector into the cable connector port on the IOC faceplate.

4.

Arrange the cable in the cable management system to prevent it from dislodging
or developing stress points. Secure the cable so that it is not supporting its own
weight as it hangs to the floor. Place excess cable out of the way in a neatly
coiled loop in the cable management system. Placing fasteners on the loop helps
to maintain its shape.

CAUTION:

Avoid bending fiber-optic cable beyond its minimum bend radius. An arc

smaller than a few inches in diameter can damage the cable and cause problems
that are difficult to diagnose.

CAUTION:

Do not let fiber-optic cable hang free from the connector. Do not allow

fastened loops of cable to dangle, which stresses the cable at the fastening point.

Step 5: Connect Ground and Power Cables

Depending on your configuration, your device uses either AC or DC power supplies.
Perform the appropriate procedures for each power supply in your device.

Connect the Grounding Cable on page 14

Connect Power to an AC-Powered Ethernet Appliance on page 15

Connect Power to a DC-Powered Ethernet Appliance on page 16

Connect the Grounding Cable

1.

Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to an approved site ESD grounding point. See the instructions
for your site.

2.

Connect the grounding cable to a proper earth ground.

3.

Verify that a licensed electrician has attached the cable lug provided with the
Ethernet appliance to the grounding cable.

4.

Make sure that grounding surfaces are clean and brought to a bright finish before
grounding connections are made.

14

Step 5: Connect Ground and Power Cables

IBM Ethernet Appliance J56S Getting Started Guide

Summary of Contents for J56S

Page 1: ...tall the Device Using a Lift 8 Install the Device Without a Mechanical Lift 10 Remove Components 11 Lift the Chassis into the Rack 11 Reinstall Components 12 Step 4 Connect External Devices and IOC Ca...

Page 2: ...r EMC Requirements 25 Canada 25 European Union 25 Hardware and Software Documentation for IBM Ethernet Appliance J56S 26 Requesting Technical Support 27 Revision History 27 2 IBM Ethernet Appliance J5...

Page 3: ...rol Boards SCBs in nonredundant fabric configurations By installing different combinations of IOCs and SPCs you can tailor both the number of gigabit ports and the maximum security processing capacity...

Page 4: ...mounting brackets extend the width to 19 in 48 3 cm The rack must be strong enough to support the weight of the fully configured device up to 163 5 lb 74 2 kg If you stack five fully configured devic...

Page 5: ...illed rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack Required Tools To unpack the Ethernet appliance and prepare for installation you need the foll...

Page 6: ...on page 6 2 On the back of each rack rail partially insert a mounting screw into the lowest hole specified in Table 2 on page 6 3 Install the mounting shelf on the back of the rack rails Rest the bott...

Page 7: ...Figure 2 Mounting Hardware for a Four Post Rack or Cabinet Step 2 Install the Mounting Hardware 7 Step 2 Install the Mounting Hardware...

Page 8: ...nstall the Device Without a Mechanical Lift on page 10 Install the Device Using a Lift 1 Ensure the rack is in its permanent location and is secured to the building Ensure that the installation site a...

Page 9: ...f the chassis and the mounting shelf overlap by approximately two inches 6 Slide the chassis onto the mounting shelf until the mounting brackets contact the rack rails The shelf ensures that the holes...

Page 10: ...ove Components on page 11 Lift the Chassis into the Rack on page 11 Reinstall Components on page 12 Figure 5 Components to Remove from the Front of the Device Figure 6 Components to Remove from the Re...

Page 11: ...s on removing device components see Install the Ethernet Appliance Without a Mechanical Lift in the IBM Ethernet Appliance J56S Hardware Guide Lift the Chassis into the Rack Lifting the chassis and mo...

Page 12: ...IL FAIL ESD OK OK OK OK OK OK OK 2 3 4 5 ACO LT YELL O W ALAR M RED ALAR M NC NO C NC NO C RE O RE 1 0 1 2 3 5 4 3 2 1 0 1 0 g004249 Reinstall Components 1 Attach an electrostatic discharge ESD ground...

Page 13: ...he Routing Engine 3 Plug the other end of the cable into the network device Connect a Management Console 1 Turn off the power to the management device 2 Plug the RJ 45 end of the serial cable into the...

Page 14: ...ble and cause problems that are difficult to diagnose CAUTION Do not let fiber optic cable hang free from the connector Do not allow fastened loops of cable to dangle which stresses the cable at the f...

Page 15: ...wrist and connect the strap to one of the ESD points on the chassis For more information about ESD see the IBM Ethernet Appliance J56S Hardware Guide 2 Locate the power cord or cords you will use to c...

Page 16: ...he PS FAIL LED does not light If any of the status LEDs indicates that the power supply is not functioning normally repeat the installation and cabling procedures Connect Power to a DC Powered Etherne...

Page 17: ...ctrostatic discharge ESD grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis For more information about ESD see the IBM Ethernet Appliance J56S Hardware Gu...

Page 18: ...tus LEDs on each power supply faceplate If a DC power supply is correctly installed and functioning normally the PWR OK BRKR ON and INPUT OK LEDs light green steadily Step 6 Perform Initial Software C...

Page 19: ...ffic interface edit admin set interfaces ge 0 0 0 unit 0 family inet address address prefix length admin set interfaces ge 0 0 1 unit 0 family inet address address prefix length 12 Configure the defau...

Page 20: ...TVn2KY3 uQe4xzQCxpR2j7sKuV Pa0 SECRET DATA login user admin uid 928 class super user authentication encrypted password 1 cdOPmACd QvreBsJkNR1EF0uurTBkE SECRET DATA services ssh web management http int...

Page 21: ...ge 0 0 1 0 policies from zone trust to zone untrust policy bob match source address any destination address any application any then permit 18 Commit the configuration to activate it on the device ed...

Page 22: ...admin commit 20 When you have finished configuring the device exit configuration mode edit admin exit admin 22 Step 6 Perform Initial Software Configuration IBM Ethernet Appliance J56S Getting Started...

Page 23: ...vice attach an ESD strap to an ESD point and place the other end of the strap around your bare wrist Failure to use an ESD strap could result in damage to the device CAUTION An external Surge Protecti...

Page 24: ...e it component side up on a flat antistatic surface or in an electrostatic bag When you install the device always make the ground connection first and disconnect it last Wire the DC power supply using...

Page 25: ...DC return i e DC I as defined in GR 1089 CORE Compliance Statements for EMC Requirements Canada This Class A digital apparatus complies with Canadian ICES 003 Cet appareil num rique de la classe A es...

Page 26: ...appliances and routing operations firewall and security services system alarms and events and network performance This guide also shows how to administer user authentication and access upgrade softwa...

Page 27: ...sion 01 Initial Release Copyright International Business Machines Corporation 2008 2009 All rights reserved Printed in USA US Government Users Restricted Rights Use duplication or disclosure restricte...

Reviews: