![IBM FlashSystem 810 Installing Instructions Download Page 17](http://html1.mh-extra.com/html/ibm/flashsystem-810/flashsystem-810_installing-instructions_3870593017.webp)
When ac power is connected, the storage system powers up and the front panel display shows the
startup sequence. When the system is fully ready, the front panel displays
Status: OK
and the system
performance statistics, including the system bandwidth and total input/output operations per second.
Figure 3. Power supplies
Installing the IBM FlashSystem 810
5
Summary of Contents for FlashSystem 810
Page 1: ...IBM FlashSystem Installing the IBM FlashSystem 810 GI11 9894 04...
Page 2: ......
Page 3: ...IBM FlashSystem Installing the IBM FlashSystem 810 GI11 9894 04...
Page 6: ...iv IBM FlashSystem Installing the IBM FlashSystem 810...
Page 36: ...24 IBM FlashSystem Installing the IBM FlashSystem 810...
Page 37: ......
Page 38: ...Part Number 00DH781 Printed in USA GI11 9894 04 1P P N 00DH781...