Running System Verification
When the Diagnostic Operating Instructions display, do the following to run system verification:
1. Press Enter.
2. If the terminal type is requested, you must use the
Initialize Terminal
option on the Function Selection
menu to initialize the operating system before you can continue with the diagnostics.
Note:
If you use a virtual terminal on the HMC and you are asked to define the terminal type, the
virtual terminal is considered a VT320.
3. Select the
System Verification
option on the Diagnostic Mode Selection menu.
4. To run a general checkout of all installed resources, select the
All Resource
option on the Diagnostic
Selection menu. Follow the instructions on the screen to complete the checkout procedure.
To check one particular resource, select that resource on the Diagnostic Selection menu.
The checkout program ends with either of the following results:
v
The Testing Complete screen displays a message stating
No trouble was found
.
v
The A Problem Was Detected On (Time Stamp) menu displays, with either a service request number
(SRN) or an error code. Make a note of any codes displayed on the display or operator panel.
To perform additional system verification, go to “Performing Additional System Verification”. To exit
diagnostics, go to “Stopping the Diagnostics”.
Performing Additional System Verification
To perform additional system verification, do the following:
1. Press Enter to return to the Diagnostic Selection menu.
2. To check other resources, select the resource. When you have checked all of the resources you need
to check, go to “Stopping the Diagnostics”.
Stopping the Diagnostics
To stop the diagnostics, do the following:
1. To exit the diagnostics, press the F3 key (from a defined terminal) or press 99 (from an undefined
terminal).
2. If you changed any attributes on your terminal to run the diagnostics, change the settings back to
normal.
3. This completes the system verification.
If the server passed all the diagnostic tests, the verification process is complete and your server is ready
to use.
Chapter 2. Verifying the Hardware Operation
21
Summary of Contents for 9114-275 - IntelliStation POWER 275
Page 1: ...IntelliStation POWER 9114 Model 275 Installation Guide SA38 0634 00...
Page 2: ......
Page 3: ...IntelliStation POWER 9114 Model 275 Installation Guide SA38 0634 00...
Page 8: ...vi IntelliStation POWER 9114 Model 275 Installation Guide...
Page 12: ...x IntelliStation POWER 9114 Model 275 Installation Guide...
Page 14: ...xii IntelliStation POWER 9114 Model 275 Installation Guide...
Page 80: ...64 IntelliStation POWER 9114 Model 275 Installation Guide...
Page 82: ...66 IntelliStation POWER 9114 Model 275 Installation Guide...
Page 84: ...68 IntelliStation POWER 9114 Model 275 Installation Guide...
Page 92: ...76 IntelliStation POWER 9114 Model 275 Installation Guide...
Page 98: ...82 IntelliStation POWER 9114 Model 275 Installation Guide...
Page 101: ......
Page 102: ...Part Number 00P5944 Printed in U S A SA38 0634 00 1P P N 00P5944...