Preparing the 9080-M9S system for operation after removing and replacing an SMP cable
To prepare the system for operation after removing or replacing an SMP cable, complete the steps in this
procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. If you chose to complete this repair with the power off, using your labels, reconnect the UPIC cables to
the system control unit.
UPIC cable locations are P1-C1-T1 and P1-C2-T1.
a. Ensure that the white plastic lock is pulled back from the plug housing.
b. Plug the UPIC cable (A) into the previously identified location in the system control unit by inserting
the cable into the connector until it locks into place.
Figure 35. Replacing the UPIC cable into the system control unit
c. Push the white plastic lock (B) onto the plug housing.
42 Power Systems: Removing and replacing parts in the 9080-M9S system
Summary of Contents for 9080-M9S
Page 1: ...Power Systems Removing and replacing parts in the 9080 M9S system IBM ...
Page 19: ...Figure 11 Identify LEDs for the service processor cables on the system node Cables 13 ...
Page 25: ...Figure 17 Service processor FSP cabling Cables 19 ...
Page 51: ...Figure 37 Identify LEDs for the UPIC cables on the system node Cables 45 ...
Page 70: ...64 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 82: ...76 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 86: ...80 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 92: ...86 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 137: ...Figure 111 Cabling a Four Node Configuration Memory modules 131 ...
Page 149: ...Figure 121 Service processor FSP cabling Memory modules 143 ...
Page 157: ...Figure 130 Removing the rear power cords L003 or or Memory modules 151 ...
Page 203: ...Figure 170 Removing the rear power cords L003 or or Memory modules 197 ...
Page 250: ... L003 or or or or 244 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 275: ...Figure 231 Cabling a Four Node Configuration Memory VRMs 269 ...
Page 287: ...Figure 241 Service processor FSP cabling Memory VRMs 281 ...
Page 294: ...288 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 298: ... L003 or or or or 292 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 323: ...Figure 271 Cabling a Four Node Configuration Miscellaneous VRMs 317 ...
Page 335: ...Figure 281 Service processor FSP cabling Miscellaneous VRMs 329 ...
Page 369: ...Figure 311 Cabling a Four Node Configuration Miscellaneous VRMs 363 ...
Page 381: ...Figure 321 Service processor FSP cabling Miscellaneous VRMs 375 ...
Page 388: ...382 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 404: ...398 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 434: ...428 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 504: ...498 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 510: ...504 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 524: ...518 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 528: ... L003 or or or or 522 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 553: ...Figure 475 Cabling a Four Node Configuration Processor VRM 547 ...
Page 565: ...Figure 485 Service processor FSP cabling Processor VRM 559 ...
Page 572: ...566 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 592: ...586 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 634: ...628 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 637: ...Figure 552 Removing the rear power cords L003 or or System processor module 631 ...
Page 681: ...Figure 592 Cabling a Four Node Configuration System processor module 675 ...
Page 693: ...Figure 602 Service processor FSP cabling System processor module 687 ...
Page 729: ......
Page 730: ...IBM ...