Figure 498. Replacing the time-of day battery cover
Preparing the 9080-M9S system control unit for operation after removing and replacing a
service processor card
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Using your labels, reconnect the cables that you removed from the service processor card.
3. If you powered off the system to complete this repair, wait for the service processor comes up to the
Flexible Service Processor (FSP) standby state (the power-on LED on the control panel is flashing
slowly) then continue to the next step to validate all of the cables. If you did not power off the system,
skip the next step and continue to the step to validate only the UPIC cables.
4. Access the ASMI and run the Cable Plugging Validation utility to validate all of the cables.
a) If you are already connected to the ASMI, go to the next step. Otherwise, click All Systems then
select system being serviced. Then, click Actions > View All Actions > Launch Advanced
Systems Management (ASM).
b) In the navigation area, expand System Service Aids > Cable Plugging Validation. Then, click
Validate Cables. The system verifies that the expected cables are present.
574 Power Systems: Removing and replacing parts in the 9080-M9S system
Summary of Contents for 9080-M9S
Page 1: ...Power Systems Removing and replacing parts in the 9080 M9S system IBM ...
Page 19: ...Figure 11 Identify LEDs for the service processor cables on the system node Cables 13 ...
Page 25: ...Figure 17 Service processor FSP cabling Cables 19 ...
Page 51: ...Figure 37 Identify LEDs for the UPIC cables on the system node Cables 45 ...
Page 70: ...64 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 82: ...76 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 86: ...80 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 92: ...86 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 137: ...Figure 111 Cabling a Four Node Configuration Memory modules 131 ...
Page 149: ...Figure 121 Service processor FSP cabling Memory modules 143 ...
Page 157: ...Figure 130 Removing the rear power cords L003 or or Memory modules 151 ...
Page 203: ...Figure 170 Removing the rear power cords L003 or or Memory modules 197 ...
Page 250: ... L003 or or or or 244 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 275: ...Figure 231 Cabling a Four Node Configuration Memory VRMs 269 ...
Page 287: ...Figure 241 Service processor FSP cabling Memory VRMs 281 ...
Page 294: ...288 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 298: ... L003 or or or or 292 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 323: ...Figure 271 Cabling a Four Node Configuration Miscellaneous VRMs 317 ...
Page 335: ...Figure 281 Service processor FSP cabling Miscellaneous VRMs 329 ...
Page 369: ...Figure 311 Cabling a Four Node Configuration Miscellaneous VRMs 363 ...
Page 381: ...Figure 321 Service processor FSP cabling Miscellaneous VRMs 375 ...
Page 388: ...382 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 404: ...398 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 434: ...428 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 504: ...498 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 510: ...504 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 524: ...518 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 528: ... L003 or or or or 522 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 553: ...Figure 475 Cabling a Four Node Configuration Processor VRM 547 ...
Page 565: ...Figure 485 Service processor FSP cabling Processor VRM 559 ...
Page 572: ...566 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 592: ...586 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 634: ...628 Power Systems Removing and replacing parts in the 9080 M9S system ...
Page 637: ...Figure 552 Removing the rear power cords L003 or or System processor module 631 ...
Page 681: ...Figure 592 Cabling a Four Node Configuration System processor module 675 ...
Page 693: ...Figure 602 Service processor FSP cabling System processor module 687 ...
Page 729: ......
Page 730: ...IBM ...