transceiver until the latching mechanism clicks.
1. Pull tab
2. QSFP cable
3. QSFP transceiver
4.
Position a cable so that the key (the ridge on one side of the cable connector) is aligned with the slot
in the transceiver. Insert the cable into the transceiver until the latching mechanism clicks.
Cables are keyed so that they can be inserted in only one way. If a cable does not slide in easily,
ensure that it is correctly oriented.
Verifying the operation of new transceivers
About this task
You can use the following commands to verify if the transceivers are working correctly:
v
sfpShow
v
switchShow
v
errDump
v
fabricShow
Refer to the Fabric OS Command Reference for output examples and descriptions.
Figure 28. Replacing a QSFP optical transceiver
50
SAN128B-6 Installation, Service, and User Guide
Summary of Contents for 8960-F96
Page 6: ...vi SAN128B 6 Installation Service and User Guide...
Page 8: ...viii SAN128B 6 Installation Service and User Guide...
Page 84: ...64 SAN128B 6 Installation Service and User Guide...
Page 100: ...80 SAN128B 6 Installation Service and User Guide...
Page 114: ...94 SAN128B 6 Installation Service and User Guide...
Page 115: ......
Page 116: ...IBM Part Number 01JC270 Printed in USA SC27 9251 00 1P P N 01JC270...