
6-4
C
HAPTER
6: S
PANNING
T
REE
P
ROTOCOL
How STP Works
STP Initialization
Initially, the STP system requires the following before it can configure
the network:
■
Communication between all the bridges. This communication is
carried out using Bridge Protocol Data Units (BPDUs), which are
transmitted in packets with a known multicast address.
■
One bridge to start as a master or Root Bridge, a central point from
which the network is configured.
The Root Bridge is selected on the basis of it having the lowest Bridge
Identifier value. This is a combination of the unique MAC address of
the bridge and a priority component defined for the bridge.
The Root Bridge generates BPDUs on all ports at a regular interval
known as the Hello Time. All other bridges in the network have a Root
Port. This is the port nearest to the Root Bridge, and it is used for
receiving the BPDUs initiated by the Root Bridge.
STP Stabilization
Once the network has stabilized, two rules apply to the network:
1
Each network segment has one Designated Bridge Port. All traffic
destined to pass in the direction of or through the Root Bridge flows
through this port. The Designated Bridge Port is the port which has the
lowest Root Path Cost for the segment.
The Root Path Cost consists of the path cost of the Root Port of the
bridge, plus the path costs across all the Root Ports back to the Root
Bridge. Table 6-1 shows the default path costs for the stack.
Table 6-1
Default path costs
Port Type
Duplex
Cost
100BASE-TX
Full
150
Half
300
10BASE-T
Full
650
Half
700
F24user.bk Page 4 Wednesday, July 15, 1998 4:27 PM
Summary of Contents for 8271 Nways Ethernet LAN Switch
Page 10: ...viii F24user bk Page viii Wednesday July 15 1998 4 27 PM...
Page 14: ...4 SAFETY NOTICES F24user bk Page 4 Wednesday July 15 1998 4 27 PM...
Page 15: ...Safety Notices 5 F24user bk Page 5 Wednesday July 15 1998 4 27 PM...
Page 16: ...6 SAFETY NOTICES F24user bk Page 6 Wednesday July 15 1998 4 27 PM...
Page 20: ...10 ABOUT THIS GUIDE F24user bk Page 10 Wednesday July 15 1998 4 27 PM...
Page 22: ...F24user bk Page 2 Wednesday July 15 1998 4 27 PM...
Page 38: ...1 16 CHAPTER 1 INTRODUCING THE SWITCH F24user bk Page 16 Wednesday July 15 1998 4 27 PM...
Page 58: ...3 10 CHAPTER 3 SETTING UP FOR MANAGEMENT F24user bk Page 10 Wednesday July 15 1998 4 27 PM...
Page 60: ...F24user bk Page 2 Wednesday July 15 1998 4 27 PM...
Page 122: ...F24user bk Page 2 Wednesday July 15 1998 4 27 PM...
Page 139: ...IV PROBLEM SOLVING Chapter 8 Problem Solving F24user bk Page 9 Wednesday July 15 1998 4 27 PM...
Page 140: ...F24user bk Page 10 Wednesday July 15 1998 4 27 PM...
Page 150: ...8 10 CHAPTER 8 PROBLEM SOLVING F24user bk Page 10 Wednesday July 15 1998 4 27 PM...
Page 152: ...F24user bk Page 2 Wednesday July 15 1998 4 27 PM...
Page 157: ...Important Safety Information A 5 F24user bk Page 5 Wednesday July 15 1998 4 27 PM...
Page 173: ...Important Safety Information A 21 F24user bk Page 21 Wednesday July 15 1998 4 27 PM...
Page 174: ...A 22 APPENDIX A SAFETY INFORMATION F24user bk Page 22 Wednesday July 15 1998 4 27 PM...
Page 184: ...D 4 APPENDIX D PIN OUTS F24user bk Page 4 Wednesday July 15 1998 4 27 PM...
Page 188: ...F 2 APPENDIX F TECHNICAL SUPPORT AND SERVICE F24user bk Page 2 Wednesday July 15 1998 4 27 PM...
Page 210: ...6 INDEX F24user bk Page 6 Wednesday July 15 1998 4 27 PM...