![IBM 4800-741 Planning, Installation, And Operation Manual Download Page 50](http://html1.mh-extra.com/html/ibm/4800-741/4800-741_planning-installation-and-operation-manual_3313398050.webp)
5.
See
Figure
18
and
place
the
unit
in
the
operating
position.
Note:
If
you
are
installing
a
UPS,
follow
the
remainder
of
these
steps.
If
you
are
not
inserting
a
UPS,
go
to
Step
7
on
page
32
to
secure
the
expansion
housing
to
the
system
unit.
a.
To
install
the
UPS,
remove
the
sheet
metal
panel
(see
Figure
18.)
b.
The
unit
as
shipped
from
the
factory
does
not
have
the
battery
connected.
Connect
the
battery
to
the
UPS
as
follows:
c.
See
Figure
19,
Picture
1.
With
the
UPS
on
its
side,
remove
the
battery
door.
d.
See
Picture
2.
Pull
the
battery
out
of
the
UPS
such
that
you
can
view
the
wiring
and
plug.
e.
Connect
the
plug
with
the
red
wire
(Picture
3).
Figure
18.
Removing
the
sheet
metal
panel
Figure
19.
Connecting
the
battery
to
the
UPS
Updated
October
31,
2007
30
SurePOS
700
Series:
SurePOS
700-721/741/781,
722/742/782
Planning,
Installation,
and
Operation
Guide
Summary of Contents for 4800-741
Page 2: ......
Page 143: ...IBM IBM GA27 4004 GA27 4004 Updated October 31 2007 Appendix A Safety information 123...
Page 163: ......