Installing the upper bezel
To install the upper bezel, complete the following steps:
1. Insert the two tabs on the right-side of the upper bezel into the corresponding
holes on the right side of the chassis.
2. Rotate the upper bezel to the left side of the chassis until the bezel clips are
aligned with the corresponding indentations on the left side of the chassis and it
snaps into place.
3. Install the lower bezel (see “Installing the lower bezel” on page 55).
4. Install the side cover (see “Installing the side cover” on page 53).
5. Lock the side cover.
6. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Chapter 4. Removing and replacing server components
57
Summary of Contents for 436854u - System x3200 M2 5U Mini Tower...
Page 1: ...System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 2: ......
Page 3: ...System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 32: ...14 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 50: ...32 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 64: ...46 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 138: ...120 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 258: ...240 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide...
Page 265: ......
Page 266: ...Part Number 49Y0163 Printed in USA 1P P N 49Y0163...