INSTALLATION AND OPERATION INSTRUCTIONS
2
SL 35-199, SL 45-260 MODULATING GAS BOILERS
SAFETY CONSIDERATIONS
Installation, start-up and servicing of IBC boilers must be done with due
care and attention, and should only be performed by competent, qualified,
licensed and trained heating technicians. Failure to read and comply with
all instructions and applicable National and local codes may result in
hazardous conditions that could result in property damage and injury to
occupants which in extreme cases might result in death.
HAZARDS & PRECAUTIONS
Supplied with the boiler
- The IBC boiler is shipped with an accessory parts kit
consisting of the following items:
•
1 x Wall mounting bracket
•
1 x Condensate trap assembly
•
1 x 30 psig pressure relief valve
•
1 x Outdoor temperature sensor
•
6 x 1/4” x 2-1/2” Lag screws/w flat washers
WARNING
If the information in this
manual is not followed
exactly, a fire or explosion
may result causing property
damage, personal injury, or
loss of life.
WARNING
Points out a potentially
hazardous situation which
must be avoided to prevent
serious injury or death.
CAUTION
Points out a potentially
hazardous situation which
must be avoided to prevent
possible moderate injury and/
or property damage
NOTE
Points out installation,
maintenance and operation
details that will result in
enhanced efficiency, longevity
and proper operation of your
boiler.
DANGER
Points out an immediately
hazardous situation which
must be avoided in order to
prevent serious injury or
death.
Summary of Contents for SL 35-199
Page 71: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...
Page 72: ...NOTES...
Page 73: ...NOTES...