Factory Pre-Startup Request
Item
General Inspection
Completed
Inspect unit for shipping and/or rigging damage.
Is unit installed with proper clearances?
Is unit installed within slope limitations?
Check terminal screws and wiring connections for tightness.
Are filters installed correctly and clean?
Check Outdoor Air dampers if installed are in operating position.
(When G terminal is shorted to R, 24V)
Have Refrigeration circuits been checked for leaks?
Is condensate drain trapped properly?
Is all field wiring (power and control) complete and sized accurately?
Is unit power correct voltage?
Mated ERV’s that ship seperatly have power & comm wires connected to RTU?
Is space thermostat run with twisted shielded wire?
Are split systems completely wired?
(Is twisted, shielded cable used?)
If G/E, is building natural gas available and piped to the unit?
Is there refrigerant in the unit / line set?
Item
Air Moving Inspection
Completed
Check alignment of drive components.
Check Supply Air fan belt tension.
Check blower pulley’s and wheel’s tight on shaft.
Check fan operates with proper rotation/direction.
Check VFD set for proper supply air CFM. (keypad display)
cfm
VAV Duct or Building Pressure tube installed?
Notes:________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Installing Contractor Signature:
_____________________________________
Printed Name:
_____________________________
Date:
_________
ultra
DRY
outside air solutions
NOTE:
If start up technician shows up and the above tasks are not complete, an additional charge will be incurred.
Summary of Contents for ultraDRY
Page 1: ...O M manual PD 02 22 2020 v 5 71 ultraDRY outside air solutions ...
Page 51: ...iAIRE OM manual iAIRE LLC 51 ...
Page 70: ...iAIRE LLC iAIRE OM manual 70 ...
Page 71: ...iAIRE OM manual iAIRE LLC 71 ...
Page 78: ...iAIRE LLC iAIRE OM manual 78 APPENDIX A CAPACITY CONTROL DEVICE ...
Page 79: ...iAIRE OM manual iAIRE LLC 79 ...
Page 80: ...iAIRE LLC iAIRE OM manual 80 ...
Page 81: ...iAIRE OM manual iAIRE LLC 81 CALL US TODAY 800 231 3112 TO DISCUSS YOUR APPLICATION ...
Page 84: ...iAIRE LLC iAIRE OM manual 84 APPENDIX B VFD ...
Page 85: ...iAIRE OM manual iAIRE LLC 85 Operating Instructions SMVector Frequency Inverter ...
Page 129: ...iAIRE OM manual iAIRE LLC 129 APPENDIX C ICM LOW AMBIENT CONTROL ...
Page 131: ...iAIRE OM manual iAIRE LLC 131 APPENDIX D SPACE SENSOR ...
Page 138: ...iAIRE LLC iAIRE OM manual 138 APPENDIX E SPLIT SYSTEM PIPING REQUIREMENTS ...
Page 139: ...iAIRE OM manual iAIRE LLC 139 iAIRE SPLIT SYSTEM PIPING CHART ...
Page 153: ...iAIRE OM manual iAIRE LLC 153 Page 2 of 4 ...
Page 154: ...iAIRE LLC iAIRE OM manual 154 Page 3 of 4 ...
Page 155: ...iAIRE OM manual iAIRE LLC 155 Page 4 of 4 ...
Page 156: ...iAIRE LLC iAIRE OM manual 156 APPENDIX F SPLIT SYSTEM DAT SENSOR INSTALLATION ...
Page 158: ...iAIRE LLC iAIRE OM manual 158 APPENDIX G MODULATING GAS VALVE ...
Page 159: ...iAIRE OM manual iAIRE LLC 159 ...
Page 161: ...iAIRE OM manual iAIRE LLC 161 ...
Page 164: ...iAIRE LLC iAIRE OM manual 164 Mod Gas Heat Install I O M manual PD 03 25 2019 v 1 2 ...
Page 165: ...iAIRE OM manual iAIRE LLC 165 APPENDIX H SMOKE SENSOR ...
Page 172: ...iAIRE LLC iAIRE OM manual 172 APPENDIX J 24 7 TIMER ...
Page 173: ...iAIRE OM manual iAIRE LLC 173 ...
Page 174: ...iAIRE LLC iAIRE OM manual 174 ...
Page 175: ...iAIRE OM manual iAIRE LLC 175 ...
Page 176: ...iAIRE LLC iAIRE OM manual 176 ...
Page 177: ...iAIRE OM manual iAIRE LLC 177 ...
Page 178: ...iAIRE LLC iAIRE OM manual 178 ...
Page 179: ...iAIRE OM manual iAIRE LLC 179 ...
Page 180: ...iAIRE LLC iAIRE OM manual 180 ...
Page 181: ...iAIRE OM manual iAIRE LLC 181 ...
Page 182: ...iAIRE LLC iAIRE OM manual 182 ...
Page 183: ...iAIRE OM manual iAIRE LLC 183 APPENDIX K HIGH HEAT BOX ...
Page 188: ...iAIRE LLC iAIRE OM manual 188 ...
Page 191: ...iAIRE OM manual iAIRE LLC 191 ...
Page 197: ...iAIRE OM manual iAIRE LLC 197 ...
Page 198: ...iAIRE LLC iAIRE OM manual 198 15 APPENDIX B Heatco Application Guide ...
Page 200: ...iAIRE LLC iAIRE OM manual 200 ...
Page 201: ...iAIRE OM manual iAIRE LLC 201 ...
Page 202: ...iAIRE LLC iAIRE OM manual 202 ...
Page 203: ...iAIRE OM manual iAIRE LLC 203 ...
Page 208: ...iAIRE LLC iAIRE OM manual 208 ...
Page 209: ...iAIRE OM manual iAIRE LLC 209 ...
Page 215: ...iAIRE OM manual iAIRE LLC 215 APPENDIX L UPC BACNET INSTALLATION ...
Page 236: ...iAIRE LLC iAIRE OM manual 236 APPENDIX M BACNET TROUBLESHOOTING GUIDE ...