background image

 

User manual 

 

2

 

Installation

 

2.1

 

General

 

Outline

 

Correct

 

installation

 

of

 

generator

 

set

 

is

 

the

 

precondition

 

which

 

ensure

 

the

 

normal

 

working

 

status

 

of

 

the

 

generator

 

set.

 

The

 

working

 

room

 

for

 

generator

 

set

 

shall

 

be

 

designed

 

specifically

 

to

 

meet

 

the

 

expected

 

functions

 

and

 

maintenance

 

operations,

 

and

 

at

 

the

 

same

 

time

 

the

 

design

 

of

 

generator

 

set

 

working

 

room

 

shall

 

conform

 

to

 

local

 

government’s

 

laws

 

and

 

regulations

 

on

 

architecture,

 

fire

 

protection

 

laws

 

and

 

other

 

applicable

 

regulations.

 

2.2

 

Transportation

 

During

 

the

 

period

 

of

 

shipment,

 

protection

 

shall

 

be

 

made

 

for

 

the

 

generator

 

set.

 

In

 

addition,

 

the

 

generator

 

set

 

shall

 

be

 

tightly

 

secured

 

in

 

the

 

loading

 

truck

 

so

 

that

 

to

 

avoid

 

any

 

vibration

 

during

 

shipment

 

which

 

will

 

cause

 

the

 

generator

 

set’s

 

components

 

loosen

 

and

 

even

 

damaged.

 

During

 

the

 

process

 

of

 

shipment

 

of

 

generator

 

set,

 

no

 

people

 

or

 

other

 

material

 

is

 

allowed

 

to

 

place

 

above

 

the

 

generator

 

set

 

so

 

that

 

to

 

avoid

 

damage

 

to

 

generator

 

set

 

caused

 

by

 

weight.

 

When

 

loading

 

or

 

unloading

 

the

 

generator

 

set

 

to

 

the

 

truck,

 

forklift

 

or

 

hoisting

 

device

 

shall

 

be

 

used

 

to

 

avoid

 

the

 

generator

 

set

 

become

 

tilted

 

or

 

fell

 

to

 

the

 

ground,

 

which

 

causes

 

damage.

 

Lifting

 

holes

 

have

 

been

 

designed

 

on

 

the

 

common

 

base

 

frame

 

of

 

our

 

generator

 

sets.

 

Some

 

of

 

the

 

specifically

 

designed

 

generator

 

sets

 

has

 

been

 

facilitated

 

with

 

lifting

 

holes

 

on

 

the

 

roof

 

and

 

forklift

 

openings

 

on

 

the

 

base

 

frame

 

etc.

 

Users

 

can

 

transport

 

the

 

generator

 

set

 

according

 

to

 

the

 

guidance

 

specified

 

on

 

the

 

specific

 

labels

 

sticked

 

on

 

the

 

generator

 

set.

 

Please

 

do

 

not

 

use

 

the

 

lifting

 

lugs

 

on

 

the

 

engine

 

or

 

on

 

the

 

alternator

 

to

 

hoist

 

the

 

whole

 

generator

 

set.

 

2.3

 

Design

 

for

 

Foundation

 

The

 

foundation

 

which

 

used

 

to

 

install

 

and

 

fix

 

the

 

diesel

 

generator

 

set

 

is

 

very

 

important,

 

it

 

must

 

conform

 

to

 

the

 

following

 

requirement:

 

Have

 

enough

 

hardness

 

and

 

stability,

 

so

 

that

 

to

 

avoid

 

deformation,

 

which

 

will

 

affect

 

the

 

concentricity

 

of

 

diesel

 

engine

 

and

 

alternator

 

and

 

other

 

accessory

 

parts.

 

To

 

support

 

the

 

weight

 

of

 

the

 

whole

 

generator

 

set

 

and

 

to

 

absorb

 

the

 

dynamic

 

impact

 

caused

 

by

 

unbalanced

 

force

 

and

 

vibration

 

during

 

engine’s

 

running

 

period.

 

Generator

 

set’s

 

foundation

 

is

 

not

 

allowed

 

to

 

connect

 

to

 

other

 

architecture’s

 

foundation.

 

The

 

width

 

and

 

depth

 

of

 

foundation

 

shall

 

meet

 

requirement.

 

Ensure

 

foundation’s

 

levelness

 

and

 

smoothness.

 

If

 

possible,

 

waste

 

discharge

 

sink

 

can

 

be

 

sued

 

so

 

that

 

the

 

waste

 

oil

 

can

 

be

 

discharged

 

in

 

a

 

timely

 

manner.

 

Cable

 

channel

 

for

 

generator

 

power

 

output

 

cable

 

need

 

to

 

be

 

reserved.

 

Normally,

 

concrete

 

foundation

 

is

 

reliable,

 

simple

 

and

 

preferable.

 

When

 

pouring

 

the

 

concrete

 

foundation,

 

please

 

make

 

sure

 

the

 

surface

 

of

 

concrete

 

is

 

flat,

 

and

 

no

 

scratch

 

is

 

allowed.

 

Gradienter

 

or

 

similar

 

instruments

 

need

 

to

 

be

 

used

 

during

 

installation

 

of

 

generator

 

set

 

and

 

its

 

exhaust

 

system.

 

The

 

design

 

of

 

foundation

 

can

 

refer

 

to

 

following

 

calculation

 

formula:

 

(below

 

is

 

the

 

diagram

 

for

 

diesel

 

generator

 

set

 

foundation)

 

1.

 

Generator

 

dimension

 

length

 

×

 

width:

 

L1×W1

 

2.

 

Foundation

 

dimension

 

length

 

×

 

width:

 

L2×W2

 

   

L2

 

=L1+400

 

(mm)

 

   

W2

 

=W1+400

 

(mm)

 

3.

 

B=2×M/

 

(L2×W2×D)

 

   

B:

 

Thickness

 

of

 

foundation

         

M:

 

Generator

 

set

 

weight

 

   

L2:

 

Length

 

of

 

foundation

           

W2:

 

Width

 

of

 

foundation

 

   

D:

 

Density

 

of

 

Concrete

 

(refer

 

to

 

2322kg/m3)

 

(Foundation

 

drawing

 

Refer

 

to

 

APPENDIX

 

A

 

)

 

 

 

2.4

 

Design

 

for

 

Generator

 

Set

 

Working

 

Room

 

The

 

installation

 

of

 

generator

 

set

 

shall

 

be

 

designed,

 

so

 

that

 

to

 

meet

 

the

 

demand

 

of

 

planned

 

operation

 

and

 

maintenance.

 

The

 

complete

 

installation

 

shall

 

conform

 

to

 

local

 

architecture

 

laws,

 

fire

 

protection

 

laws

 

and

 

other

 

applicable

 

regulations.

 

Except

 

the

 

above

 

matters,

 

there

 

are

 

other

 

matters

 

needs

 

your

 

attention

 

as

 

follows:

 

Ensure

 

diesel

 

engine

 

generator

 

set

 

working

 

room

 

is

 

furnished

 

with

 

rainproof,

 

sunscreen,

 

and

 

windproof.

 

Ensure

 

diesel

 

engine

 

generator

 

set

 

working

 

room

 

has

 

good

 

ventilation

 

and

 

good

 

exhaust

 

system,

 

and

 

the

 

area

 

for

 

ventilation

 

is

 

sufficient,

 

and

 

at

 

the

 

same

 

time

 

use

 

pipes

 

to

 

let

 

out

 

the

 

hot

 

air

 

generated

 

from

 

the

 

radiator

 

and

 

prevent

 

the

 

hot

 

air

 

from

 

returning.

 

Ensure

 

the

 

waste

 

gas

 

generated

 

during

 

generator

 

set

 

running

 

period

 

can

 

be

 

discharged

 

to

 

outside

 

timely,

 

and

 

try

 

your

 

best

 

to

 

reduce

 

the

 

adverse

 

effect

 

caused

 

to

 

environment.

 

The

 

silencer

 

and

 

exhaust

 

pipe

 

shall

 

be

 

supported

 

by

 

the

 

roof,

 

the

 

supporter

 

shall

 

allow

 

the

 

exhaust

 

pipe

 

to

 

expand.

 

It

 

is

 

not

 

permitted

 

to

 

install

 

the

 

exhaust

 

system

 

directly

 

on

 

the

 

generator

 

set.

 

Enough

 

space

 

shall

 

be

 

reserved

 

for

 

the

 

diesel

 

generator

 

set

 

for

 

convenience

 

of

 

cooling,

 

operation

 

and

 

maintenance

 

etc.

 

Generally

 

speaking,

 

no

 

foreign

 

material

 

is

 

allowed

 

to

 

be

 

placed

 

within

 

the

 

area

 

of

 

Summary of Contents for DHY11KSE

Page 1: ...Diesel Generator User Manual...

Page 2: ......

Page 3: ...s close to the battery and fuel because the mixture of volatilization from fuel and hydrogen generated by battery charging process will cause explosion when it meets sparkle or naked flame The generat...

Page 4: ...is running do not attempt to reach under or around the guards to do maintenance or for any other reason Keep hands arms long hair loose clothing and jewelers away from pulleys belts and other moving...

Page 5: ...al disconnected prior to attempting to connect or disconnect load connections Do not attempt to connect or disconnect load connections while standing in water or on wet or soggy ground Make sure conne...

Page 6: ...rator Set Working Room 4 2 5 Installation of Generator Set 5 2 6 Cooling system 7 2 7 Lubricant system 8 2 8 Fuel system 8 2 9 Battery 10 2 10 Electrical Connection 11 2 11 Power distribution system 1...

Page 7: ...andby power supply to provide continue electric power for non invariable loads The generator set is suitable for the area where must ensure continue power supply such as hospitals industrial facilitie...

Page 8: ...pusher fan and thermostat The alternator has its own internal fan to cool the alternator components 1 6 Electrical System The engine electrical system is 12 volt or 24 volts DC negative ground earth...

Page 9: ...litated onnect direc valve is an UNDAI Pow n for the rplus lubrica t by openin ransportatio been designe Standard ca fting hole o enerator set canopy roo me which b o have stati the generato Optional...

Page 10: ...ect to other architecture s foundation The width and depth of foundation shall meet requirement Ensure foundation s levelness and smoothness If possible waste discharge sink can be sued so that the wa...

Page 11: ...et to outside For example corrugated vibration reduction pipe has been used to connect exhaust pipes air exhaust path fuel inlet pipe fuel return pipe and busbar cable etc all of these parts need to u...

Page 12: ...ssure and side stress Reserve some space for hot shrinkage and cold expansion Reserve space for generator set vibration Reduce exhaust noise level Overload of exhaust backpressure will cause following...

Page 13: ...the liquids in a separate container evenly and then add the mixture into the radiator ensure the anti freeze will not freeze under low temperature In the area when there is low possibility of freezing...

Page 14: ...specification as that existing in the radiator For some generator sets installed with coolant filter please open the filter s valve before put into use 2 7 Lubricant system Lubricant system is compose...

Page 15: ...or sets provide base frame style fuel tank for customer The base frame style fuel tank is installed with fuel tank fuel pipes and fuel level indicator This fuel supply system does not need customer to...

Page 16: ...are required to correctly connect the signal line to this control panel details see the control panel operation manual Automatic transfer panel optional is the automatic transfer switch for transfer...

Page 17: ...t be connected to an earth ground Since the set is mounted on vibration isolators the ground connection must be flexible to avoid possible breakage due to vibration Ground connection cables or straps...

Page 18: ...tart Part of the generator set control panel has been furnished with idle speed full speed transfer switch users can choose if the engine need to be started in idle speed or in one time full speed Usu...

Page 19: ...ing situation and if there is any malfunction warning generator set shut down etc Only when the correct and complete record for running maintenance has been kept very well the user can get correct and...

Page 20: ...number 3 times the Alarm LCD would flash If you need to restart wait at least 30 seconds before the retry 8 Check the reading of Voltage Meter and Frequency Meter by operating the Voltmeter Change Ov...

Page 21: ...ight means AMF controller is active then user can select operation type OFF MAN AUTO MEASUREMENT A OFF mode Start stop mains power on off generator set power on off is inactive in this mode B MAN mode...

Page 22: ...if generator set is used for self start standby power In order to achieve full automatic transfer between mains power and generator set power to guarantee all load present our ATS panel select the bes...

Page 23: ...O that is OK detail operate step refer module control system ATS PANEL introduction No MODEL 1 ATS switch 2 panel lock 3 mains power output hole 4 generator power output hole 5 communicate with genera...

Page 24: ...battery For each 50 600 hours of running or at least each 12 months Change lubricant and lubricant filter Because the quality of lubricant oil sulfur content of the fuel and lubricant consumption rate...

Page 25: ...refer to Control Panel Operation Manual for details 4 5 Start battery Batteries which have been stored in a long time shall be properly charged before being used so that to ensure normal capacitance o...

Page 26: ...iminate the malfunction s Especially important for new generator set s customer One thing must to be emphasized most of the malfunctions are caused by user s improper installation operation and mainte...

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ...DHY10KE KSE DHY250KE KSE...

Page 36: ...DHY10KE KSE DHY250KE KSE...

Page 37: ...DHY10KE KSE DHY250KE KSE...

Page 38: ...DHY10KE KSE DHY250KE KSE...

Page 39: ...DHY10KE KSE DHY250KE KSE...

Page 40: ...DHY10KE KSE DHY250KE KSE...

Page 41: ...APPENDIX E 1...

Page 42: ...2...

Page 43: ...3...

Page 44: ...running record TIME ENGINE PARAMETER GENERATOR PARAMETER IF RECORD FOR MALFUNCTION IS AVAILABLE OPERATOR REMARK Start stop generator set time Accumulated running time Oil pressure Temperature Voltage...

Page 45: ...serial No Engine serial No Alternator serial No Accumulated running hours Maintenance cycle Reasons for maintenance periodic maintenance or malfunction maintenance Inspection and repair Inspection an...

Page 46: ...APPENDIX H...

Page 47: ......

Page 48: ...Licensed by Hyundai Corporation Korea For Inquiries Please Contact GRV POWER PRODUCTS S L Avda Alguema 8A 17771 Sta LLogaia Alguema Spain Tf 34 972 67 38 36 www hyundaipower es...

Reviews: