11
HYPRO WATER – 05.2021
11
3.
Installation
3.1
Requirements applicable to the
installation site
– The installation site must be clean and
dry.
– A suitable socket must be available at
the installation site. The socket must
have been installed and set up by
a qualified electrician. The electrical
connections must comply with the local
regulations. The mains voltage must
concur with the voltage specifications
on the data plate.
➡
“2.4 Technical data” (page 10).
– Installation above the worktop requires
a suitable recess in or behind the
worktop through which the mains cable
and hoses are routed.
– If the wall bracket is used: Select the
installation site such that 10 cm remains
clear beneath the device for mounting
on the wall bracket.
– Select the installation site such that 20
cm remains clear above the device to
facilitate a filter change.
– If the device is used with the HYPRO
app: A WLAN connection to the
internet must be available at the
installation site.
– If a boiler is used, this must have been
professionally installed.
– The tap at the installation site must
have been professionally installed.
Examples:
a 3-way tap
b 2-way tap
c Supplementary tap
3.1 / 1
a
b
c
y
Observe the documentation for your
water tap.
Water tap documentation.
Summary of Contents for HYPRO WATER
Page 1: ...User manual HYPRO WATER EN 05 2021 ...
Page 52: ...05 2021 ...