Assemble

NOTE:   

Coat  all  backup  rings  and  O-rings  with  a

light coat of clean hydraulic oil to make installation
easier.

NOTE:  

The assembly procedures for the auxiliary I

and  II  sections  are  the  same.  The  auxiliary  I  sec-
tion  is  used  in  the  procedures  described  below  be-
cause it contains the anti-stall valve.

1. 

Install the spool, washer, spring, and plug, with

new  O-ring,  into  the  bore  of  the  auxiliary  con-
trol  valve  section.  Tighten  the  plug  to  14
±1 N•m (120 ±12 lbf in). See Figure 7.

2. 

Install the washer, spring, and plug, with new
O-ring, into the auxiliary control valve section.
See  Figure  7.  Tighten  the  plug  to  14
±1 N•m (120 ±12 lbf in).

3. 

Install two poppets, two springs, and two plugs,
with  new  O-rings  installed,  into  the  auxiliary
control valve section. See Figure 7. Tighten the
plugs to 81 ±8 N•m (60 ±6 lbf ft).

4. 

Install  the  new  O-ring,  backup  ring,  two  O-
rings,  and  backup  ring  on  each  PPRV.  Install
two PPRVs and four capscrews into the auxili-
ary control valve section. See Figure 7. Tighten
the capscrews to 3 ±0.3 N•m (24 ±2 lbf in).

Install

NOTE:  

 Step 1 and Step 2 are for a three-function

control  valve.  Step  3  through  Step  5  are  for  four-
function control valves.

1. 

Install new O-rings into the side of tilt control
valve  section.  Install  the  auxiliary  I  control
valve section on the four tie rods. See Figure 8.

2. 

Install the outlet control valve section. See Out-
let Control Valve Section, Install
.

3. 

Install new O-rings into the side of tilt control
valve  section.  Install  the  auxiliary  I  control
valve section on the four tie rods. See Figure 8.

4. 

Install the auxiliary II control valve section on
the  four  tie  rods.  Install  new  O-rings  into  the
side of auxiliary II control valve section.

5. 

Install the outlet control valve section. See Out-
let Control Valve Section, Install.

6. 

Install the four nuts on the tie rods on the out-
let  control  valve  section.  Tighten  the  three
13  mm  (½  in.)  nuts  to  24  ±2  N•m  (212
±18  lbf  in)  and  the  15  mm  (9/16  in.)  nut  to  45
±4 N•m (33 ±3 lbf ft). See Figure 6.

Tilt Control Valve Section

Remove

1. 

Remove  the  outlet  control  valve  section.  See
Outlet Control Valve Section, Remove.

2. 

Remove  the  auxiliary  control  valve  section(s).
See Auxiliary Control Valve Section, Remove.

3. 

Remove  the  tilt  control  valve  section  from  the
lift/lower control valve section.

4. 

Remove  and  discard  O-rings  from  the  side  of
lift/lower control valve section.

Disassemble

NOTE:   

Disassemble  the  tilt  control  valve  section

only as needed to accomplish the repairs required.

1. 

Remove  four  socket  head  capscrews  and  two
proportional  pressure-reducing  valves  (PPRV)
from the tilt control valve section. See Figure 8.
Remove  and  discard  the  backup  ring,  two  O-
rings,  backup  ring,  and  O-ring  from  each
PPRV.

2. 

Remove  the  plug,  spring,  washer,  and  spool
from  the  tilt  control  valve  section.  Discard  the
O-ring on the plug. See Figure 8.

3. 

Remove  the  socket  head  capscrew,  spring  and
piston from the spool.

4. 

Remove the plug, spring, and washer from the
tilt control valve section. Discard the O-ring on
the plug. See Figure 8.

5. 

Remove  two  plugs,  two  springs,  and  two  pop-
pets from the tilt control valve section. Discard
one O-ring from each plug. See Figure 8.

Main Control Valve Repair

2000 SRM 1899

10

Summary of Contents for Fortis S40FT

Page 1: ...Hyster U005 H80FT H90FT H100FT H110FT H120FT Forklift Service Repair Manual...

Page 2: ...VALVE WITH VARIABLE DISPLACEMENT PUMP S4 0FT 4 5FT 5 5FT S5 5FTS S80 100 120FT S80 100FTBCS S120FTS S120FTPRS J004 H4 0FT5 FT6 H4 5FTS5 H4 5FT6 H5 0 5 5FT H80 90 100 110 H120FT U005 PART NO 4128559 2...

Page 3: ...dic Maintenance section Keep the unit clean and the working area clean and orderly Use the correct tools for the job Keep the tools clean and in good condition Always use HYSTER APPROVED parts when ma...

Page 4: ...Install 10 Tilt Control Valve Section 10 Remove 10 Disassemble 10 Clean 11 Inspect 12 Assemble 12 Install 12 Lift Lower Control Valve Section 12 Remove 12 Disassemble 12 Clean 13 Inspect 14 Assemble 1...

Page 5: ...n 28 Inspect 28 Assemble 28 Accumulator Replacement 29 Remove 29 Install 30 This section is for the following models S4 0FT 4 5FT 5 5FT S5 5FTS S80 100 120FT S80 100FTBCS S120FTS S120FTPRS J004 H4 0FT...

Page 6: ...ore information Please click here Then get the complete manual NOTE If there is no response to click on the link above please download the PDF document first and then click on it Have any questions pl...

Page 7: ...Operating multiple functions simultaneously will result in a non proportionate increase in pump flow to functions which receive the lowest amount of pressurized fluid The hydraulic circuitry will inc...

Page 8: ...FT LOWER SECTION 5 PROPORTIONAL PRESSURE REDUCING VALVE PPRV 6 TILT SECTION 7 SECONDARY RELIEF VALVE 8 AUXILIARY I SECTION 9 AUXILIARY II SECTION 10 ACCUMULATOR PORT 11 EMERGENCY LOWERING VALVE 12 TRA...

Page 9: ...nt eye injuries WARNING Be careful when cleaning with steam Steam can cause serious burns Wear protective clothing gloves and eye protection Never expose your skin to steam NOTE Take all necessary ste...

Page 10: ...ends and control valve ports to pre vent contamination 8 Remove the two SCU mounting capscrews and move the SCU approximately 1 3 cm 0 5 in to the left Lower the SCU until the steering shaft is disen...

Page 11: ...s of the control valve to prevent the possibility of contaminants getting into the con trol valve openings which could cause damage to the control valve CAUTION If O rings are to be replaced between t...

Page 12: ...ring washer and poppet from the secondary relief valve plug 6 Remove secondary relief valve plug from outlet control valve section 7 Remove and discard the backup ring from the secondary relief valve...

Page 13: ...on easier NOTE Perform Step 1 through Step 7 only if the secondary relief valve was repaired 1 Install a new backup ring on the secondary re lief valve plug See Figure 6 2 Install the poppet washer an...

Page 14: ...Figure 7 Auxiliary I and II Control Valve Sections Main Control Valve Repair 2000 SRM 1899 8...

Page 15: ...ntrol valve section Discard the O ring on the plug See Figure 7 4 Remove two plugs two springs and two pop pets from the auxiliary control valve section Discard one O ring from each plug See Fig ure 7...

Page 16: ...I control valve section on the four tie rods See Figure 8 4 Install the auxiliary II control valve section on the four tie rods Install new O rings into the side of auxiliary II control valve section...

Page 17: ...shield to pre vent injury to the eyes 1 If all components of the tilt control valve sec tion have been removed clean the tilt control valve section and components except the two PPRVs using cleaning...

Page 18: ...ws to 3 0 3 N m 24 2 lbf in Install 1 Install new O rings on the side of lift lower con trol valve section 2 Install the tilt control valve section on the lift lower control valve section 3 Install th...

Page 19: ...o the user or to other personnel Make sure the path of the compressed air is away from all personnel Wear protective goggles or a face shield to prevent injury to the eyes 1 If all components of the l...

Page 20: ...14 1 N m 120 12 lbf in Install 1 Install new O rings on side of transition control valve section 2 Install lift lower control valve section on transi tion control valve section 3 Install the tilt cont...

Page 21: ...reassembled immediately coat surfaces with clean hydraulic oil to prevent the possibility of rust Cover the transition control valve section with a clean dry lint free cloth to prevent the possibilit...

Page 22: ...6 in nut to 45 4 N m 33 3 lbf ft See Figure 6 INSTALL WARNING The main control valve weighs approximately 30 5 kg 67 lb Use a lifting device capable of lift ing the main control valve to avoid the pos...

Page 23: ...OPORTIONAL PRESSURE REDUCING VALVE PPRV 6 TILT SECTION 7 SECONDARY RELIEF VALVE 8 AUXILIARY I SECTION 9 AUXILIARY II SECTION 10 ACCUMULATOR PORT 11 EMERGENCY LOWERING VALVE 12 TRANSITION SECTION 13 LO...

Page 24: ...ve compound Hyster P N 251099 to the three mounting capscrews Us ing the three capscrews that hold the throttle base to the cowl install the pedal assembly on the lift truck Connect the cowl wiring ha...

Page 25: ...NG CAPSCREWS 6 LOAD SENSE LINE 7 LIFT LOWER HOSE 8 TILT HOSE 9 AUXILIARY I HOSE 10 AUXILIARY II HOSE 11 ACCUMULATOR 12 RETURN HOSE 13 AUXILIARY FUNCTION PROPORTIONAL PRESSURE REDUCING VALVE HARNESS PP...

Reviews: