
© Copyright 2018 HYPERVSN. All rights reserved
21
5.4
WALL INSTALLATION (STEP 4)
Use the patterns in Application 1 as a reference to attach the short and long alignment
mounts
in the appropriate way.
Contact [email protected], if the
pattern required
is absent in Application 1.
1.
Mark the desired positions for the holes of alignment mounts.
Picture 18. Marking holes for drilling
The key screw bolt mark should be at the top. The distance between central points
of the Devices is 403mm.
Note.
You may seek assistance from [email protected] for a special template for
marking a wall (see Application 1). The template should be printed in A1 format and then
attached to the wall for drilling guidelines.
2.
Drill holes in the marked positions. The diameters of holes on the two types of
walls are as follows:
•
Partitioned wall - 8.3mm
•
Concrete wall -
8mm.
If the Wall is installed on a partitioned wall and you would like to hide the Device’s
power cords, ensure that the holes that you drill into wall are big enough to feed
the AC plug used (region specific) through.
3.
Take the alignment mount (select either a long or short mount, according to the
specific Wall pattern used). Disassemble the alignment mount: unscrew the four
screws.
KEY SCREW-BOLT
CENTRAL POINT