![HYOSUNG NH-2700 Operator'S Manual Download Page 205](http://html1.mh-extra.com/html/hyosung/nh-2700/nh-2700_operators-manual_2193012205.webp)
NH-2700 6. Installation
6- 2
6. Installation
6.1 Installation Information
Installation condition and space
Following conditions should be met before installing equipment.
1) Temperature while operating should be between 41°F - 104°F.
2) Relative humidity while operating should be between 25% < RH < 85%, Non-Condensed.
3) Avoid locations where intense direct light is reflected off the LCD screen.
4) Avoid locations where strong static electricity can occur.
5) Avoid placing the product next to equipment that produces electromagnetic waves. It could interfere
with data transfer.
6) The floor must allow easy wheelchair access from the front or the side.
7) Space required for servicing the machine should be considered before installation.
Tools required for installation
In order to move the machine and place it in a proper location, you should seek the help of
professionals trained in moving heavy equipment.
Following tools are needed to install the machine.
1) Wire cutter
2) Lifter
3) Screw driver (Flat, Phillips)
4) Wrench (Spanner)
5) Leveling tool
Summary of Contents for NH-2700
Page 1: ...NH 2700 Front Load Operator Manual Copyright 2010 Nautilus Hyosung Inc All right reserved...
Page 5: ...NH 2700 1 Introduction 1 1 Chapter 1 Introduction...
Page 9: ...NH 2700 2 Precautions for Safety 1 2 Chapter 2 Precautions for Safety...
Page 13: ...NH 2700 3 Hardware Specifications 3 1 Chapter 3 Hardware Specifications...
Page 24: ...NH 2700 4 Operating Instructions 4 1 Chapter 4 Operating Instructions...
Page 34: ...NH 2700 4 Operating Instructions 4 11 Fig 4 12 Changing Battery 2...
Page 58: ...NH 2700 4 Operating Instructions 4 35 NOTE THE BASIC MECHANISM OF RECEIPT PRINTER...
Page 61: ...NH 2700 5 Operator Function 5 1 Chapter 5 Operator Function...
Page 136: ...NH 2700 5 Operator Function 5 76 Touch Type...
Page 204: ...NH 2700 6 Installation 6 1 Chapter 6 Installation...
Page 210: ...NH 2700 6 Installation 6 7 Fig 6 5 Installation space 2 Side view 45...
Page 212: ...NH 2700 7 Appendix 7 1 Chapter 7 Appendix...
Page 248: ...NH 2700 7 Appendix 7 37 2 Select SYSTEM SETUP menu 3 Select SYSTEM CONTROL menu...
Page 324: ...NH 2700 7 Appendix 7 113 2 Press ADVERTISEMENT button 3 Press TRANSACTION ADVERTISEMENT button...
Page 334: ...NH 2700 7 Appendix 7 123 2 Press OPTIONAL FUNCTION 2 button 3 Press SCREEN SERVICES button...