Notification of readiness for commissioning a HPS Systems
Unit:
HPS-
Order
.-No.: AB
Plant designation / Location:
Dear Sirs,
For commissioning the following sanitary / electrical connections must be supplied and in
function:
On-site power supply (230V, 50 Hz)
Water supply (reverse osmosis water) with line pressure 2 – 5 bar
Control signal 0-10 V and safety chain
Sewage connection DN40
Mounting rails are installed according to instructions
Vortex module wall and droplet separators are inserted in the mounting rails
Fan, heat exchanger and control for a test run of the entire system
Hose guides M32 for high pressure hoses through the device chamber
We need about 4 hours for the commissioning of one unit. During this time, the system will
be switched on and off for several times, and control signals should be allowed to be set
manually. The presence of an on-site control engineer is therefore imperative.
Please send us the notification of readiness preferably
10 working days
before the desired
date.
Best regards
Your HygroMatik Service Team
We confirm that the above connections are fully ready.
Desired date for commissioning: ___________________________
If the comissioning cannot be performed due to on-site reasons such as lack of water,
or power supply, the resulting travel costs and time will be charged.
Date: _______
Company/Signature: ______________________
Company:
Service / Hotline
Lise-Meitner-Str. 3
Address:
24558 Henstedt-Ulzburg
Contact
partner :
Tel. :+49(0)4193/895-293
Fax : -33
Date :
e-mail:
[email protected]
web : www.Hygromatik.de