background image

P/N 42-9540 11/12 Copyright 2012 Hydrotherm

Page 6 

KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING

Vent piped through the roof 

(combustion air from the boiler room) 

(cont.)

1

Table 1 

Vent system components

Figure 2 

Vent termination minimum clearances

 

Slope horizontal runs toward the boiler

. All horizontal runs of vent pipe 

must slope continuously at least 1/4 inch per foot 

(21 mm per meter)

 to ensure 

condensate drains completely back to the boiler. DO NOT install the vent piping 
with any sections that could trap condensate.

2 — Vent piping components

 

See Table 1 for acceptable vent components. 

NO OTHER

 vent materials are 

acceptable.

 

Carefully follow the instructions supplied by the vent piping manufacturer.

 

Th e vent joints seal with elastomer rings in the pipe and fi tt ings. Avoid damaging 
these seals.

 

Adjustable lengths of EZ-Seal pipe

 — Length adjustments with EZ-Seal piping 

are made with slip-fi t adjustable length sections, not by cutt ing the pipe. Make sure 
the adjustable length does not jut into elbows or terminations. Th is could block 
fl ue gas and condensate fl ow. 

 

Maximum vent piping length

 — See the table in Figure 3 for the maximum 

allowable length. Each elbow causes the same pressure drop as 10 feet of vent pipe, 
so the allowable length reduces 10 feet for each elbow used in the piping. When 
45° elbows are used, two 45° elbows are equivalent to one 90° elbow.

 

Insulate the vent piping where it passes through unheated areas

 to prevent 

condensate freeze-up.

 

If the pipe passes through an occupied space, install a chase around the pipe, 
following the vent pipe instructions and applicable codes.

 

Clearance from combustible materials

 — Provide minimum clearance to all 

combustible materials of at least 2 inches 

(51 mm)

.

 

Using an existing chimney as a chase

 — Th e vent piping can be routed through 

an existing 

UNUSED and STRAIGHT chimney

DO NOT

 vent directly into the 

chimney. Install the vent piping so it can be inspected aft er installation. Follow vent 
pipe manufacturer’s instructions for chimney-as-chase installations.

3 & 4 — Support the vent piping completely

 

DO NOT use the boiler vent connection to support the vent piping

. Provide 

support straps from the ceiling and pedestal supports from the fl oor; utilize 
noncombustible saddle. Th is is required on ALL installations, regardless of the 
length of the horizontal piping connected to the boiler.

 

Vent piping cannot be supported from above (such as relying on roof jack sections). 
You must install supports on the horizontal piping before the vent turns upward. 
Provide a support on the horizontal piping 

within 6 inches of every upturned 

elbow

 to support the vertical run.

 

Install at least one support on every horizontal run

. For horizontal runs 

longer than 5 feet 

(1.5 m)

, install a support every 3 feet 

(0.9 m)

.

 

Follow the vent pipe manufacturer’s instructions for placement and installation of 
supports.

5 — Floor and wall penetrations

 

Follow applicable codes and the vent pipe instructions to install fi re stops, thimbles 
or other devices at all fl oor and wall penetrations.

 

Provide minimum 2 inches 

(51 mm)

 clearance to all combustible construction.

6 — Roof penetrations

 

Follow applicable codes and the vent pipe instructions to install a roof jack, fl ashing 
and support. Long extensions of vent pipe above the roof may require the use of 
guy supports as specifi ed in the vent pipe instructions.

7 — Rain cap termination

 

Use only the rain caps listed in Table 1.

 

Th e rain cap exhaust opening must be at least 2 feet 

(0.6 m)

 

above the highest roof point within 10 feet, as shown in 
Figure 1. See the National Fuel Gas Code, ANSI/NFPA 54 
for details on pitched roof applications.

 

See Figure 2 for additional minimum clearances.

Combustion air openings

 

Combustion air must be supplied from the boiler room as 
shown in Figure 1. Make sure the installation provides air 
openings as required by applicable codes and the Boiler 
manual.

Multiple boiler installations

 

Install multiple vents through the roof following all guide-
lines for single-vent installations.

 

Install the vents so they are no closer than 12 inches on 
centers.

KN-2

KN-4

Vent components

Heat-Fab

Heat-Fab

Vent piping/components
(incl. supports, thimbles, etc.)

EZ-Seal

3-inch

EZ-Seal

4-inch

Rain cap vent termination

5300CI

5400CI

Joint sealant, required

GE RTV106 or equivalent

GE RTV106 or equivalent

Summary of Contents for KN-2

Page 1: ...stantial property damage The boiler can only be operated with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with cont...

Page 2: ...pingcomponentforHeat fabventpipe orgearclampsforvent pipe Neverusescrewsintheventpiping ScrewsareonlyappliedtotheairpipingportionofHeat fabSC concentric vent used for concentric vent air sidewall term...

Page 3: ...KN 2 Vent components Heat Fab KN 4 Vent components Heat Fab Vent piping components incl supports thimbles etc EZ Seal 3 inch Vent piping components incl supports thimbles etc EZ Seal 4 inch Rain cap...

Page 4: ...s Heat Fab Air components Heat Fab Termination elbow Same as vent termination Termination elbow Same as vent termination Air piping components also supports thimbles etc 3 inch PVC CPVC ABS galvanized...

Page 5: ...rials could result in vent system failure Exposed vent pipe poses a potential burn hazard to people and pets Insulate or shield the pipe where necessary to prevent risk Never drill through or install...

Page 6: ...piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilize noncombustible saddle This is re...

Page 7: ...operly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when inst...

Page 8: ...se installations 3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor ut...

Page 9: ...ding flexible aluminum duct if desired Whenusingmetallicpiping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of...

Page 10: ...ar clamp manufactured by the vent manufacturer see Table 2 Slide the clamp over the male end of the pipe after the pipe has been inserted from outside From the inside pull the pipe so it is firmly aga...

Page 11: ...roperly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when ins...

Page 12: ...3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilizing noncombus...

Page 13: ...ping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of silicone RTV to seal the connection If the boiler room ai...

Page 14: ...If a longer length is required use a length of EZ Seal long enough for the application Attach the air piping to the male end bottom end of the stainless steel pipe C Roof penetration components Use th...

Page 15: ...ode compliance Follow all applicable local codes when installing the vent system Where codes differ from this manual followcoderequirements ContactHydrothermifyou have any questions regarding the inst...

Page 16: ...late the vent piping where it passes through unheated areas to prevent condensate freeze up Do not insulate the within 18 inches of the termination when it passes through a combustible wall If the pip...

Page 17: ...application Insert the pipe from OUTSIDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer s...

Page 18: ...IONS FOR VENT AND AIR PIPING Figure 12 Termination minimum clearances Vent piped through a side wall combustion air from the boiler room cont 4 Figure 13 Using external piping to raise the termination...

Page 19: ...ual followcoderequirements ContactHydrothermifyou have any questions regarding the installation Terminate the vent and air piping following the guidelines in this manual Avoid vent termination locatio...

Page 20: ...ler Install at least one support on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacks...

Page 21: ...IDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer see Table 5 Slide the clamp over the m...

Page 22: ...16 Vent termination minimum clearances see Figure 18 for required spacing between vent and air terminations Figure 17 Using external piping to raise the termination Figure 18 Minimum spacing between v...

Page 23: ...s likely to be affectedbywinds snowdrifts peopleandpets Protectbuilding materials and vegetation from degradation caused by the flue gases and condensation Vent piping see Figure 19 1 Boiler vent conn...

Page 24: ...on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacksections You must install supports...

Page 25: ...nd the pipe B Length of concentric vent pipe Use a 1 foot length of vent pipe as listed in Table 6 unless the wall penetration quires a longer length If a longer length is required use a length of Hea...

Page 26: ...e wall concentric termination cont 6 Figure 21 Termination minimum clearances see Figure 22 for required spacing between terminations Figure 22 Minimum spacing between terminations terminations must a...

Page 27: ...P N 42 9540 11 12 Copyright 2012 Hydrotherm Page 27 KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING 7...

Page 28: ...IN UNITED STATES 260 NORTH ELM ST WESTFIELD MA 01085 413 564 5515 FAX 413 568 9613 IN CANADA 7555 TRANMERE DRIVE MISSISSAUGA ONT L5S 1L4 905 672 2991 FAX 905 672 2883 www hydrothermkn com...

Reviews: