HydroTherm KN-2 Installation Instructions Manual Download Page 14

P/N 42-9540 11/12 Copyright 2012 Hydrotherm

Page 14 

KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING

10 —Air pipe termination

 

(see Figure 8)

 

See Table 3 for part numbers of the vertical termination components required 
for EZ-Seal air pipe installations.  Th e air piping termination must be constructed 
using the stainless steel vent materials listed in Table 3 to ensure the confi guration 
is correct. DO NOT terminate the air piping with any other method.

 

Termination assembly components:

A. 

Rain cap

 — Use only the rain cap listed in Table 3, the same cap as used on 

the vent termination.

Install the rain cap so it meets the minimum clearances shown in Figure 9, 
page 11.

B.  Length of vent pipe

 — Use a 3-foot length of vent pipe as listed in Table 3 

unless the roof penetration requires a longer length to meet minimum 
clearances. If a longer length is required, use a length of EZ-Seal long enough 
for the application.

Att ach the air piping to the male end (bott om end) of the stainless steel pipe.

C.  Roof penetration components

 — Use the same components as used for 

the vent penetration.

Multiple boiler installations

Venting multiple boilers

 

Install multiple vents through the roof following all guidelines for single-vent 
installations.

 

Install the vents so they are no closer than 12 inches on centers.

 

Provide minimum 5 feet between the center line of any vent termination and any 
air intake termination.

Air piping for multiple boilers

 

Air for each boiler must be individually piped. 

DO NOT

 use combined air piping.

 

Install multiple air pipes through the side wall following all guidelines for single-air 
pipe installations.

 

Install the terminations so they are no closer than 12 inches on centers.

 

Provide minimum 5 feet between the center line of any vent termination and any 
air intake termination.

Vent and air piped through the roof 

(separate terminations) 

(continued)

3

Summary of Contents for KN-2

Page 1: ...stantial property damage The boiler can only be operated with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with cont...

Page 2: ...pingcomponentforHeat fabventpipe orgearclampsforvent pipe Neverusescrewsintheventpiping ScrewsareonlyappliedtotheairpipingportionofHeat fabSC concentric vent used for concentric vent air sidewall term...

Page 3: ...KN 2 Vent components Heat Fab KN 4 Vent components Heat Fab Vent piping components incl supports thimbles etc EZ Seal 3 inch Vent piping components incl supports thimbles etc EZ Seal 4 inch Rain cap...

Page 4: ...s Heat Fab Air components Heat Fab Termination elbow Same as vent termination Termination elbow Same as vent termination Air piping components also supports thimbles etc 3 inch PVC CPVC ABS galvanized...

Page 5: ...rials could result in vent system failure Exposed vent pipe poses a potential burn hazard to people and pets Insulate or shield the pipe where necessary to prevent risk Never drill through or install...

Page 6: ...piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilize noncombustible saddle This is re...

Page 7: ...operly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when inst...

Page 8: ...se installations 3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor ut...

Page 9: ...ding flexible aluminum duct if desired Whenusingmetallicpiping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of...

Page 10: ...ar clamp manufactured by the vent manufacturer see Table 2 Slide the clamp over the male end of the pipe after the pipe has been inserted from outside From the inside pull the pipe so it is firmly aga...

Page 11: ...roperly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when ins...

Page 12: ...3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilizing noncombus...

Page 13: ...ping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of silicone RTV to seal the connection If the boiler room ai...

Page 14: ...If a longer length is required use a length of EZ Seal long enough for the application Attach the air piping to the male end bottom end of the stainless steel pipe C Roof penetration components Use th...

Page 15: ...ode compliance Follow all applicable local codes when installing the vent system Where codes differ from this manual followcoderequirements ContactHydrothermifyou have any questions regarding the inst...

Page 16: ...late the vent piping where it passes through unheated areas to prevent condensate freeze up Do not insulate the within 18 inches of the termination when it passes through a combustible wall If the pip...

Page 17: ...application Insert the pipe from OUTSIDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer s...

Page 18: ...IONS FOR VENT AND AIR PIPING Figure 12 Termination minimum clearances Vent piped through a side wall combustion air from the boiler room cont 4 Figure 13 Using external piping to raise the termination...

Page 19: ...ual followcoderequirements ContactHydrothermifyou have any questions regarding the installation Terminate the vent and air piping following the guidelines in this manual Avoid vent termination locatio...

Page 20: ...ler Install at least one support on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacks...

Page 21: ...IDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer see Table 5 Slide the clamp over the m...

Page 22: ...16 Vent termination minimum clearances see Figure 18 for required spacing between vent and air terminations Figure 17 Using external piping to raise the termination Figure 18 Minimum spacing between v...

Page 23: ...s likely to be affectedbywinds snowdrifts peopleandpets Protectbuilding materials and vegetation from degradation caused by the flue gases and condensation Vent piping see Figure 19 1 Boiler vent conn...

Page 24: ...on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacksections You must install supports...

Page 25: ...nd the pipe B Length of concentric vent pipe Use a 1 foot length of vent pipe as listed in Table 6 unless the wall penetration quires a longer length If a longer length is required use a length of Hea...

Page 26: ...e wall concentric termination cont 6 Figure 21 Termination minimum clearances see Figure 22 for required spacing between terminations Figure 22 Minimum spacing between terminations terminations must a...

Page 27: ...P N 42 9540 11 12 Copyright 2012 Hydrotherm Page 27 KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING 7...

Page 28: ...IN UNITED STATES 260 NORTH ELM ST WESTFIELD MA 01085 413 564 5515 FAX 413 568 9613 IN CANADA 7555 TRANMERE DRIVE MISSISSAUGA ONT L5S 1L4 905 672 2991 FAX 905 672 2883 www hydrothermkn com...

Reviews: