background image

 

 

 

 
 
 

HYDROMETER GmbH 

Industriestraße 13 · 91522 Ansbach · T49 (981)  18 06 - 0 · T49 (981) 18 06 – 615 
Am Weimarer Berg 3 · 99510 Apolda/Thüringen · T49 (3644)  84 33 - 0 · T49 (3644) 84 33 - 411     
[email protected] · www.hydrometer.de · Subject to technical adjustments · 12.05.2011 

IZAR CENTER 60/120/250 | IZAR CENTER 60/120/250 Memory 

 

Installation 

 

 
 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

157,5 mm

68 

66 

67 

29 30 31 32 33 34

 

 1  2  3  4  5  6

 

IZAR CENTER 250 MEMORY 

M-Bus 
USB/LAN 
RS232/Rep 
Modem 
Rx/Tx 

12345678 
00204AA9BD3E

 
 
 
Important Note:  

The IZAR CENTER device may only be installed and operated by trained 
personnel. 

 
 

Mounting and Dismounting 

 

IZAR CENTER is prepared for mounting on a standard rail mount. 

 
Important Note: 

Disconnect power supply (16) prior to mounting or dismounting the IZAR 
CENTER device. 

 
Mounting:

 

Clamp the IZAR CENTER device on the rail mount. The black hook at the 
bottom of the device should snap in firmly.

 

Dismounting: 

Use a screwdriver to pull the black hook down. The IZAR CENTER device will 
snap off the rail mount and you can take it off.

 

59 mm 
42 mm 

/  

65 16 

86 mm

Reviews: