Installation
Sec. 3 Pg. 7
Step
Procedure
3.3
Tighten the plugs on the side that is left unattached to the point that the bottom of the plugs are flush with the bot-
tom of the Connecting Links. This ensures that the plugs will not rotate and, therefore, will be properly aligned
with the feature on the HP PRO body. A spacer that is 2 1/2” tall will help ensure that the plugs stay in position.
A 4” PVC Pipe cut 2 1/2” long and then cut in half lengthwise is found to be the best spacer.
3.4
When Plugs are in position slide the two units together (try to keep approximately the same weight on both units
for best alignment). When units are pushed together the top plug is pulled up to lock the bottom plug in position.
The Top Plug can then be tightened (
It is important to keep pulling the top plug up while tightening to keep
the bottom plug engaged
).
3.5
Now that units are connected the Plugs may be assembled at the front location to finish the attachment (Refer to
Connecting Units Chart to find out where mooring links attach).
Installation Instructions
Connecting Units
HydroHoist Marine Group
Model: HYDROPORT PRO
Fig P.