8
2.OO installation
(continued)
2.O5 Electrical Connections
(continued)
Washer Signals
(North America Models)
The signal wires from each washer connect to their Multi-
Washer Communications Box using the row of connectors
at the lower edge of the circuit board, with the grounds
jumpered to have a common connection, as shown to the
right.
DIP Switch 5 - AFS Time
(NA Models)
On the DIP switch that identifies the Communications Box
(see above),
the fifth DIP switch is used to adjust the
time period
for Auto-Formula Select (AFS).
With switch 5 in the
Off position, 5 seconds
is the AFS
time, so an AFS signal of 15 seconds would select Formula
3. With switch 5 in the
On position, 3 seconds
is the AFS
time, so an AFS signal of 9 seconds would select Formula 3.
Level Probes Wiring:
An optional low level alarm (see section 5.0 Service Parts)
with up to 8 depletion wands can be connected to the
MW-3000 control cabinet.
The low level alarm is powered by an external power
source using a plug at 110-230 VAC. To wire the system,
connect the two wires from each depletion wand to the
appropriate contacts on the Level Board (see images at
right) and route the two-conductor cable from the Level
Board (A & B) through the opening in the bottom of the
cabinet and wire to the X2 terminal block at contact A2 and
B2 as shown.
(
* Note!
Although some of the X2 block connections are
labeled differently for the Metric and North America models,
the referenced
two bottom-row contacts of the X2
block are labeled A2 and B2
for both models.)
Internet Connection:
The controller cabinet has an
external Ethernet jack available for communication across
networks and over the Internet. In can be used as follows:
•
Cell Modem Connection
: If a strong enough signal is
available near the laundry room, you can connect the
controller to a cellular modem, to create a connection to
the Internet. A monthly data subscription is required.
Recommended
Low Level
cable routing
Bottom of Control Cabinet
Level Board
Inside
Control Cabinet
* Note!
3-5A Char.C
L(+) N(-) PE
+
+
-
-
DC OK
Ajust
22-28V
Weidmuller
PROeco
9
+
-
B
A
+
B
A
IN 1
IN 6
IN 2
IN 3
IN 4
IN 5
ON
1 2 3 4 5
IN 8
IN 7
COM NO COM NO
+
B
A
+
+
+
+
+
+
+
+
Product 01
PE
N
L
X1
-
-
O14
O13
O12
O11
-
-
O16
O15
X3
A3
A2
+
+
B2
B3
X2
Washer Signal
Wires
5 = Off
AFS time
is 5 sec.
5 = On
AFS time
is 3 sec.
Installer
supplied wiring,
color will vary!
1
2
3
Inside
Control
Cabinet
3-5A Char.C
L(+) N(-) PE
+
+
-
-
DC OK
Ajust
22-28V
Weidmuller
PROeco
3-5A Char.C
L(+)
N(-)
PE
+
+
-
-
DC OK
Ajust
22-28V
Weidmuller
PROeco
Control Cabinet Circuit Breaker
When all electrical work is done, switch ON the circuit
breaker located inside the control cabinet, to the upper
right, to power up the system.
Circuit
Breaker