Preparing the module for operation
Preparing the module for operation
Setting up the module
The module has 4 casters. Before pushing, release the hand brake on the
casters. Push the module on the casters into the required position. Always
use the handles when pushing the CTM-EF.
When you have positioned and aligned the module, set the brakes on all the
casters.
Place the module on an even, level surface to the right of the CTM-SC.
Make sure that there is a minimum clearance of 0.5 m all around the CTM-
EF.
Make sure that the installation location provides proper laboratory conditions
with appropriate cleanliness and temperature of the air and environment.
CAUTION
"G60 Spezial" test liquid
Hazardous to health
►
Make sure that there is adequate ventilation.
►
Observe the information relating to personal
protection equipment in the safety data sheet
of the test liquid.
CTM-EF 3xxx series
en(us)
Page 20 / 48
BeWa CTM-EF 3xxx 4229881a en-us 2018-03-06.docx
2017-03-06