Pg 3.12
H22
CONSISTENT INACCURACY
(make sure blade kerf value is correct)
- change "Actual Pos." parameter to 1.
This will make the PLC show actual shuttle travel in AUTO
With no material in the machine:
- program JOB 1 for 2 pieces of 5" length, JOB 2 for 2 pieces of 10" length, and JOB 3 for 2 pieces
of a length as one shuttle will allow.
- enter JOBS 1, 2 and 3 into QUEUE.
- record measurement on the display each time the shuttle vise reaches the target length and
closes. It should equal the required length plus the programmed kerf value. Check that this
measurement is +/-.002" for each length.
If the overshoot /undershoot is very inconsistent, it could be related to an incorrect shuttle cushion
period. This may be caused by "Decel. Dist." parameter being set too low, defective fast or reverse
output relays on the PLC, or the hydraulic cushion valve (located at the hydraulic manifold) may be
faulty.
LINEAR INACCURACY
(not valid for machines with linear encoder)
v )
- load machine with a piece of stock for test cutting
- open parameters screen
- initiate length calibration (see 3.17)
- re-enter new ACT LTH (Actual Length) value
- recut test lengths and check if accuracy is satisfactory.
Summary of Contents for H-22A
Page 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Page 9: ...SECTION 1 INSTALLATION ...
Page 11: ...Pg 1 2 H22 H 18 H 22 LIFTING INSTRUCTIONS ...
Page 14: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Page 15: ...SECTION 2 OPERATING INSTRUCTIONS ...
Page 25: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 35: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 54: ...Pg 3 19 H22 DATE SERVICED BY COMMENTS SERVICE RECORD NOTES ...
Page 55: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 56: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Page 57: ...SECTION 4 ELECTRICAL SYSTEM ...
Page 63: ...Pg 4 6 H28 32 ELECTRICAL SCHEMATIC and WIRING DRAWINGS 240 volts ...
Page 64: ...Pg 4 7 H28 32 0 5283 0 7 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 ...
Page 65: ...Pg 4 8 H28 32 ...
Page 66: ...Pg 4 9 H28 32 0 5283 0 7 7 1 7KH 5RFN 6ROLG 6ROXWLRQ 0 ...
Page 67: ...Pg 4 10 H28 32 ...
Page 68: ...Pg 4 11 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 69: ...Pg 4 12 H28 32 ...
Page 70: ...Pg 4 13 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 71: ...Pg 4 14 H28 32 ...
Page 72: ...Pg 4 15 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 73: ...Pg 4 16 H28 32 ...
Page 74: ...Pg 4 17 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 75: ...Pg 4 18 H28 32 ELECTRICAL SCHEMATIC and WIRING DRAWINGS 480 575 volts ...
Page 76: ...Pg 4 19 H28 32 0 5283 0 7 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 ...
Page 77: ...Pg 4 20 H28 32 ...
Page 78: ...Pg 4 21 H28 32 0 5283 0 7 7 1 7KH 5RFN 6ROLG 6ROXWLRQ 0 ...
Page 79: ...Pg 4 22 H28 32 ...
Page 80: ...Pg 4 23 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 81: ...Pg 4 24 H28 32 ...
Page 82: ...Pg 4 25 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 83: ...Pg 4 26 H28 32 ...
Page 84: ...Pg 4 27 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 85: ...Pg 4 28 H28 32 ...
Page 86: ...Pg 4 29 H28 32 0 7KH 5RFN 6ROLG 6ROXWLRQ 7 1 0 5283 0 7 ...
Page 87: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 88: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Page 89: ...SECTION 5 HYDRAULIC SYSTEM ...
Page 91: ...Pg 5 2 H22 CYLINDER ASSEMBLIES Piston assemblies Gland assemblies ...
Page 92: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 93: ...Pg 5 4 H28 32 ...
Page 94: ...Pg 5 5 H28 32 ...
Page 95: ...Pg 5 6 H28 32 ...
Page 96: ...Pg 5 7 H28 32 ...
Page 97: ...Pg 5 8 H28 32 ...
Page 98: ...Pg 5 9 H28 32 ...
Page 99: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 100: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Page 101: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 115: ...Pg 6 14 H28 32 ...
Page 116: ...Pg 6 15 H28 32 ...
Page 117: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...SECTION 7 OPTIONAL ASSEMBLIES SECTION 7 OPTIONAL ASSEMBLIES ...
Page 119: ...SECTION 7 OPTIONAL ASSEMBLIES ...
Page 121: ...Pg 7 2 H1822 20011 H 18 H 22 OUTBOARD BUNDLING ASSEMBLY ...
Page 122: ...SECTION 8 SPECIFICATIONS SECTION 8 SPECIFICATIONS ...
Page 123: ...SECTION 8 SPECIFICATIONS ...
Page 125: ...Pg 8 2 H22 2001 H 22 LAYOUT DRAWING ...
Page 126: ...SECTION 9 WARRANTY SECTION 9 WARRANTY ...
Page 127: ...SECTION 9 WARRANTY ...