Step 5 - refitting the cover and outlet
•
Slide the cover back over the unit, ensuring
not to trap the outlet tubes at the base of the
unit. Then secure with the 4 cover screws.
•
Slide the thinner tube into the rear hole of the
outlet nozzle (fig 7), ensure the tube does not
protrude.
•
Slide the larger outlet silicone tube into the
larger hole in the outlet nozzle. Locate the
tab on the back of the outlet nozzle into the
slot in the surround (fig 7) and slide nozzle
upwards to engage. Press nozzle firmly into
surround to lock in position (fig 8). A click
indicates success.
Step 6 - Electrical Connection
•
Electrical connection should be made via 13A
switched fuse spur in accordance with the
latest edition of the IEE Wiring Regulations:
This appliance MUST BE EARTHED.
Step 7 - Commissioning and operation
•
Turn on the water supply and ensure there are no leaks.
•
Switch the electrical power on.
Automatic commissioning will then commence. The (automatic) stages in
commissioning are as follows:
•
At first power on, the status ring and caution indicators will be illuminated
red, the water tank will completely fill with water through the solenoid valve.
This will take several minutes depending on the capacity of the unit.
•
When the level sensor detects that the tank is full of water, the heating element
is switched on.
PRESS
CLICK
TAB
SLOT
Fig 7
Fig 8