5
Maintenace
Page 5-26
InoFlex
®
VF016 - VF026
© Copyright
Edition C
HWR Spanntechnik GmbH
EN
5.2.5
M
AINTENANCE SCHEDULE
Prior to each use of the centering vice
Visual inspection of condition and function
Table 5-1: Maintenance work prior to each use
During ongoing operation
Regular visual inspection for contamination
Table 5-2: Maintenance work during ongoing operation
After each use of the machine
Manual cleaning
Table 5-3: Maintenance work after each use
every 8
operating hrs
every 40
operating hrs
every
1200 / 800*
operating hrs
Lubricate each grease nipple (s.
Chapt. 5.2.6)
for normal
operation
Check the clamping force with a
suitable clamping force meter:
measure on 2 jaws (1/2 total
clamping force)
X
Remove the centering vice and
clean it (s. Chapt. 5.3)
X
*) for heavy-duty
operation
Table 5-4: Maintenance work according to operating hours
General hazard
The centering vice must be provided with sufficient grease. Other-
wise clamping force will be lost. Risk of accident!
Summary of Contents for InoFlex VF016
Page 8: ......