G.13
CR 125 2011 - WR 125 2011
H06578
3
H06579
3
H06580
1
ENGINE OVERHAUL
Workshop Manual Ed. 06-2011
Various crankshaft straightness check
Place the crankshaft between centres and take the measurement with a dial
gauge, checking that the detected value does not exceed 0.05 mm (0.00196
in.).
Bearings
Carefully wash bearings with mixture and dry with compressed air without turn
-
ing them. Lightly lubricate and slowly turn the internal ring by hand; Rotation
unevenness, hard spots or excessive clearance shall not be found. It is good
practice to replace the bearings at each engine overhaul. The main bearings
shall always be removed in pairs and installed with the
writing pointing out
-
wards;
to replace them it is necessary to heat up the crankcase halves in a fur-
nace at 90°÷100°C and remove the bearing using a driver tool and a hammer.
Install the new bearing (while the crankcase is still hot) perfectly squarely with
respect to the housing axis, using the special installer that only applies pres
-
sure to the outer race. Let the parts cool down, and make sure that the bearing
is tightly secured to the crankcase half.
To replace the bearing onto the gear selector shaft, use puller part no.
8000
43720
.
Make sure that the sector gear (1) is not loose; if necessary,replace the key, the
screw and the washer, and reassemble with Loctite 648.
Summary of Contents for SMS 125 2011
Page 1: ...CR 125 2011 WR 125 2011 Workshop Manual Ed 06 2011 ...
Page 6: ......
Page 7: ...b 1 CR 125 2011 WR 125 2011 b Workshop Manual Ed 06 2011 IMPORTANT NOTICES Section ...
Page 9: ...A 1 CR 125 2011 WR 125 2011 A Workshop Manual Ed 06 2011 GENERAL INFORMATION Section ...
Page 16: ......
Page 17: ...B 1 CR 125 2011 WR 125 2011 B Workshop Manual Ed 06 2011 MAINTENANCE Section ...
Page 24: ......
Page 25: ...C 1 CR 125 2011 WR 125 2011 C Workshop Manual Ed 06 2011 TROUBLESHOOTING Section ...
Page 31: ...D 1 CR 125 2011 WR 125 2011 D Workshop Manual Ed 06 2011 SETTINGS AND ADJUSTMENTS Section ...
Page 60: ......
Page 61: ...E 1 CR 125 2011 WR 125 2011 E GENERAL PROCEDURES Workshop Manual Ed 06 2011 Section ...
Page 88: ......
Page 89: ...F 1 CR 125 2011 WR 125 2011 F ENGINE DISASSEMBLY Workshop Manual Ed 06 2011 Section ...
Page 106: ......
Page 107: ...G 1 CR 125 2011 WR 125 2011 G ENGINE OVERHAUL Workshop Manual Ed 06 2011 Section ...
Page 131: ...H 1 CR 125 2011 WR 125 2011 H ENGINE ASSEMBLY Workshop Manual Ed 06 2011 Section ...
Page 149: ...I 1 CR 125 2011 WR 125 2011 I FRONT SUSPENSION Workshop Manual Ed 06 2011 Section ...
Page 174: ......
Page 175: ...J 1 CR 125 2011 WR 125 2011 J REAR SUSPENSION Workshop Manual Ed 06 2011 Section ...
Page 183: ...L 1 CR 125 2011 WR 125 2011 L BRAKES Workshop Manual Ed 06 2011 Section ...
Page 196: ......
Page 197: ...M 1 CR 125 2011 WR 125 2011 M ELECTRICAL SYSTEM Workshop Manual Ed 06 2011 Section ...
Page 231: ...N 1 CR 125 2011 WR 125 2011 N ENGINE COOLING Workshop Manual Ed 06 2011 Section ...
Page 237: ...W 1 CR 125 2011 WR 125 2011 W SPECIAL TOOLS Workshop Manual Ed 06 2011 Section ...
Page 244: ......
Page 245: ...Y 1 CR 125 2011 WR 125 2011 Y CHASSIS AND WHEELS Workshop Manual Ed 06 2011 Section ...