
4. Remove the 7 screws.
5. Remove central bolt to release bearing hub.
6. Remove the 5 nuts.
7. Remove the vibration dampening plate and the 5
vibration damping units.
8. Install in the opposite sequence.
To replace the vibration damping units BS 110
page 17
.
WARNING:
Use protective gloves.
The blades are very sharp.
2. Remove the weights. Refer to
.
3. Remove the 6 screws and the bottom cover.
4. Remove the 5 nuts and the cutting head.
5. Remove the 5 washers (A).
B
C
A
6. Remove the 5 screws (B) and the 5 vibration
damping units (C).
7. Install in the opposite sequence.
16
1804 - 001 - 06.05.2022
Summary of Contents for BS 110
Page 119: ...1804 001 06 05 2022 119 ...