
Page 9 of 24
Hunting Energy Services (Well Intervention) Ltd
3.0 Disassembly and Re-assembly
The procedure for disassembly and re-assembly for a X-over is described fully in this section. It is
important that these procedures are followed for correct operation of this equipment. For the item
numbers listed in the disassembly/re-assembly processes, refer to assembly drawing in Annex V of
this manual. O-rings should be removed as encountered during disassembly.
NOTE:
Failure to follow the procedures in this section may result in
equipment failure or damage.
3.1 Disassembly Instructions
Remove Thread Protectors if applicable.
Remove Collar if applicable. (Split Collar shown)
o
For Split Collar – Remove Spirol Pins/Set Screws, back off Hub from Flange and
remove.
Remove handles if applicable
.
For X-overs with mid joints separate.
3.2 Re-assembly Instructions
With a suitable solvent, clean and inspect all parts for damage or wear.
Replace or repair any badly worn or damaged parts.
Lubricate all sealing surfaces and install new seals.
Assemble in reverse order of disassembly and torque top and bottom subs if applicable.
Fit new Spirol Pins where used.
Summary of Contents for X-Over
Page 1: ...X Over Tool Manual Manual Revision Prepared Checked Approved Date C P Kinnaird 09 06 2017 ...
Page 15: ...Page 15 of 24 Hunting Energy Services Well Intervention Ltd Annex I Quick Union Table ...
Page 16: ...Page 16 of 24 Hunting Energy Services Well Intervention Ltd ...
Page 17: ...Page 17 of 24 Hunting Energy Services Well Intervention Ltd Annex II Torque Value Chart ...
Page 18: ...Huntin ng Energy Se ervices Well l Intervention n Ltd Page 18 o of 24 ...
Page 19: ...Page 19 of 24 Hunting Energy Services Well Intervention Ltd Annex III API Flanges ...
Page 20: ...Page 20 of 24 Hunting Energy Services Well Intervention Ltd ...