
Page 14 of 24
Hunting Energy Services (Well Intervention) Ltd
7.0 Storage requirements
Draining after testing
All equipment shall be drained and lubricated after testing and prior to storage or shipment.
Rust prevention
Prior to shipment, parts and equipment shall have exposed metallic surfaces protected with a rust
preventative that does not become fluid and run at a temperature of less than 50 °C (125 °F).
Sealing-surface protection
Exposed sealing surfaces shall be protected from mechanical damage for shipping.
Ring Gaskets
Loose ring gaskets shall be boxed or wrapped during shipping and storage.
Age control of non-metallic materials
Indoor storage.
maximum storage temperature not to exceed 49 °C (120 °F).
protected from direct natural light.
stored unstressed.
stored away from contact with liquids.
protected from ozone and radiographic damage.
8.0 Disposal
Hunting does not have a working life limit for its pressure control equipment. Good maintenance and
correct adherence to procedures will increase the longevity of the equipment.
Many companies have a working life policy for pressure control equipment, this will supersede the
above statement.
9.0 Transportation
The Hunting X-Over should be stored:
Fully assembled with Thread Protectors fitted
The hydraulic fittings protected
The components should be stored in the PCE transportation unit on the shaped rack (if available).
Summary of Contents for X-Over
Page 1: ...X Over Tool Manual Manual Revision Prepared Checked Approved Date C P Kinnaird 09 06 2017 ...
Page 15: ...Page 15 of 24 Hunting Energy Services Well Intervention Ltd Annex I Quick Union Table ...
Page 16: ...Page 16 of 24 Hunting Energy Services Well Intervention Ltd ...
Page 17: ...Page 17 of 24 Hunting Energy Services Well Intervention Ltd Annex II Torque Value Chart ...
Page 18: ...Huntin ng Energy Se ervices Well l Intervention n Ltd Page 18 o of 24 ...
Page 19: ...Page 19 of 24 Hunting Energy Services Well Intervention Ltd Annex III API Flanges ...
Page 20: ...Page 20 of 24 Hunting Energy Services Well Intervention Ltd ...