
Page 10 of 24
Hunting Energy Services (Well Intervention) Ltd
4.0 Maintenance
We recommend that all pressure containing equipment be subjected to a formal maintenance
schedule, devised to ensure that the equipment is always fit for purpose. If followed correctly this will
minimise downtime and ensure the safety of those who need to work with and around it. Many
companies have established preventive maintenance programs that require re-certification of the
equipment on a quarterly, semi-annual, or annual basis.
Ideally, any X-Over should be stripped, redressed and tested prior to every job, or every quarter as a
minimum. It should be flushed out and all internal surfaces greased after every job. If possible it
should be stored filled with clean oil.
The procedure specified by Hunting is the recommended minimum. This will be superseded by
the policies of individual companies.
4.1 Routine maintenance
Completely disassemble all components and clean thoroughly before inspecting for wear,
corrosion or damage. Pay particular attention to metal/metal seal surfaces on X-Overs.
Seal bores must be inspected thoroughly
Threaded connections must be inspected thoroughly
Elastomers showing any wear should be replaced
Equipment must be fully function tested once reassembled
BEFORE EVERY JOB:
Certification should be checked to confirm equipment compliance with operational needs
Confirm all component pieces are tightened correctly
Pressure test and function as per operational requirements
AFTER EVERY JOB:
Disassemble, clean and inspect all components
Inspect all seals and sealing surfaces, replace as necessary
Check all threaded connections
Reassemble as per the assembly instructions
Pressure test to working pressure
WHEN CHECKING COMPONENTS FOR DAMAGE OR WEAR:
Particular attention should be paid to:
Sealing surfaces
Threads
Lubricate all sealing surfaces and install new seals if required.
Summary of Contents for X-Over
Page 1: ...X Over Tool Manual Manual Revision Prepared Checked Approved Date C P Kinnaird 09 06 2017 ...
Page 15: ...Page 15 of 24 Hunting Energy Services Well Intervention Ltd Annex I Quick Union Table ...
Page 16: ...Page 16 of 24 Hunting Energy Services Well Intervention Ltd ...
Page 17: ...Page 17 of 24 Hunting Energy Services Well Intervention Ltd Annex II Torque Value Chart ...
Page 18: ...Huntin ng Energy Se ervices Well l Intervention n Ltd Page 18 o of 24 ...
Page 19: ...Page 19 of 24 Hunting Energy Services Well Intervention Ltd Annex III API Flanges ...
Page 20: ...Page 20 of 24 Hunting Energy Services Well Intervention Ltd ...