background image

2

JIN04MKIIC_V1 10/01/17

Contents

INSTALLATION & COMMISSIONING
CHECKLIST ................ .......... ......................................... 3
TECHNICAL DATA…………………………............................... 5

INSTALLING THE APPLIANCE………………………………. ....... 6

FLUE ARRANGEMENT …………………………………............................................................................8
ADDITIONAL AIR VENTING (GB ONLY) ............. ........................................................................8
OPENING THE STOVE DOOR……………………………………................................................................9
GAS SUPPLY CONNECTIONS........... .................. ......................................................................10
TESTING SUPPLY PRESSURE ........... .................. ......................................................................10

INSTALLATION OF THE FIRE-BED INTO THE
STOVE………….…………………………………………………………. 11

FITTING THE CANOPY – (OPTIONAL)................. ......................................................................14
SPILLAGE MONITORING SYSTEM……………………………… ............................................................14

SERVICING INSTRUCTIONS…………............................... 16

SPARES................................... ......................................................................... 17

Please read these instructions carefully

This appliance is intended for use on a gas installation with a governed

meter.

It is important that your stove is correctly installed as Hunter Stoves Limited cannot accept
responsibility for any fault arising through incorrect installation.

Summary of Contents for HUNTER HAWK 4 MKII

Page 1: ...ase leave this instruction booklet with the user after the installation is complete Leave the system ready for operation and instruct the user in the correct use of the appliance and operation of its...

Page 2: ...RESSURE 10 INSTALLATION OF THE FIRE BED INTO THE STOVE 11 FITTING THE CANOPY OPTIONAL 14 SPILLAGE MONITORING SYSTEM 14 SERVICING INSTRUCTIONS 16 SPARES 17 Please read these instructions carefully This...

Page 3: ...ler Retailer Name Address Telephone Number Email Date Purchased APPLIANCE INFORMATION Date Installed Appliance Stock Code Appliance Description Serial Number INSTALLER INFORMATION Installer Name Gas S...

Page 4: ...IONING CHECK Complete Sign Pass Fail Flue is correct for the appliance Flue flow test Spillage test Gas soundness let by test Standing gas pressure mbar Appliance working pressure on High Setting mbar...

Page 5: ...GAS Nominal Gas Pressure 20mbar Supply Gas Type Category G20 I2H Injector Type Marking 59 Heat Input Gross Full Low 4 7kW 3 5kW Gas Flow Rate m3 h Full 0 447 NOx Class 4 Efficiency Class 2 Countries o...

Page 6: ...legally responsible for the safe installation of the appliance with due regard to all relevant local and national building regulations 3 All outer surfaces of the stove excepting the gas control knob...

Page 7: ...e clearance must be given between the appliance and the walls so that a satisfactory spillage test can be performed as detailed on page 17 MINIMUM CLEARANCE DISTANCES TO DIMENSION DESCRIPTION COMBUSTI...

Page 8: ...ney block It is suggested to run flue pipe at least 615mm vertically from the unit before there are any changes in direction of the flue system Wherever possible horizontal runs of the flue system sho...

Page 9: ...to the burner tray first make sure that the stove is switched off and is cold Firstly remove the door handle by turning anticlockwise Keep turning until the handle is completely removed as shown in p...

Page 10: ...test point on the tube going to the control valve circled in diagram 3b Turning the screw approximately half a turn anti clockwise with a small flat bladed screwdriver opens the test point ALWAYS CLOS...

Page 11: ...ER STOVES LTD ACCEPTS NO RESPONSIBILITY FOR ANY INJURY HOWEVER CAUSED WHILST HANDLING HOT COALS LOGS OR CERAMICS FIRE BED ARRANGEMENT This appliance can be fitted with log effect ceramics The fire bed...

Page 12: ...left hand fork should then rest on the edge of the matrix and the side of the stove As shown in photo 7 Photo 7 Installing Log B 4 Log C sits in a groove to the right of Log B behind the third flame...

Page 13: ...matrix the top resting on log C to the left of it photo 10 The log picture is now complete The stove should be lit and the flame picture checked with the door sealed shut Any adjustments to the flame...

Page 14: ...se all doors and windows in the room containing the fire before the test is carried out Complete the Ceramic Coal or Log picture close the door and replace the handle 1 Ensure that the fire is burning...

Page 15: ...by lack of flue pull or flue blockage The spillage system MUST NOT be adjusted modified or put out of action by the installer The spillage system MUST NOT be removed or bridged out for any reason If...

Page 16: ...n away any lint or light carbon soot deposits out of the gas ports on the burner top plate 4 Replace the ceramic matrix and loose coals logs as per the fire bed arrangement instructions Page 11 using...

Page 17: ...PHKDRSK DOOR ROPE KIT STANDARD DOOR SCPHKRSK GAS BURNER FULL ASSEMBLY 4kW NATURAL GAS MANUAL CONTROL GYB04NYM OXIPILOT 6kW 4kW GAS BURNER CFB06102 GAS VALVE MANUAL CFB06100 KNOB MANUAL GAS VALVE 6kW 4...

Reviews: