INSTALLATION
9
Install the Fabric Into the Headrail
Side Stack
■
With the fabric colored side facing you,
align the trike with the middle channel in
the headrail on the moving rail side.
IMPORTANT:
Be sure the cords are
routed to the outside of the trike before
sliding the trike into the channel.
➤
Slide the trike into the headrail.
Split Stack
■
Split stack shades have two trikes. Slide each trike
into the channel from each end of the headrail and
abut them to one another. The stationary rails will be
on the outside ends of the shade. See “Product View
— Split Stack” on page 2.
Trike
Cords in the
correct position.
Headrail
Channel
Trike
Headrail