Documents and Forms
____ Rubrail sealed secured to hull
____ Sliding hatches drains free of debris
____ Companionway drop-ins fit properly in companionway and stowage rack
____ Load bearing hardware securely fastened. This includes but is not limited to chainplates, winches and handrails
____ Traveler arch securely fastened. Stainless Steel models should be properly grounded
See owners manual for details
____ Plexiglas hatches, ports, windscreens and windows adjusted and cleaned.
Cleaners and polishers specifically for Plexiglas can be purchased from most marine supply stores
____ External teak cleaned and oiled (Teak decking cleaned with mild soap and water)
____ External railings cleaned with soap and water then hand polished using automotive wax
____ All deck fill caps seal properly and have retainer chains intact (except Waste Pump-out)
____ Dorade vents or sealing caps installed
____ Topside surface clean and free of gelcoat damage
Interior Inspection
____ Drop-in hatches for bunks and floors in place and fit securely
____ Interior steps and grab rails secured
____ Bilges clean and free of debris
____ Opening port and hatch screens in place
____ Blinds / privacy curtains, shades and interior cushions cleaned, installed and secured
____ All doors open / shut / latch properly
____ Insure all wires and connection on distribution panels are tight (should be
professionally inspected)
____ Television / VCR operational
____ Stereo / Tape / CD operational
____ Chapman’s Manual onboard and readily available
____ Safety gear onboard readily available and up to date.
See Chapman’s Manual and US Coast Guard website at < www.uscg.mil >for details.
____ Boat owner’s manual onboard
In Water Inspection
Dockside inspection of Engine, Pre-start sequence and operating system
____ Review engine manual for maintenance requirements and proper starting procedure
____ Propeller shaft properly aligned (per engine manual)
____ Shaft to engine coupling bolted and properly torque (per engine manual)
____ All engine mounting bolts in place and properly torque (per engine manual)
____ Crankcase oil at full mark (per engine manual)
____ Transmission fluid / oil at full mark (per engine manual)
____ Coolant mix ratio proper - heat exchanger and expansion tanks full (per engine manual)
____ Seawater intake valve open and no leaks
____ Air bled from fuel lines and system
____ No fuel leaks at any fittings
____ Throttle linkages smooth and operational
____ Shutdown system operational
____ USCG Oil Discharge warning poster in place
____ Exhaust elbows and hoses tight
____ Starting sequence and alarms correct
____ Oil pressure acceptable (per engine manual)
____ Coolant temperature acceptable (per engine manual)
2.7
Summary of Contents for H39
Page 1: ...H39 V2 062012 P N 1035787 Operator s Manual ...
Page 2: ......
Page 9: ...Introduction H39 Chapter 1 DC 062012 P N 1035787 ...
Page 14: ...Notes Introduction 1 6 ...
Page 15: ...V2 062012 P N 1035787 Documents Forms H39 Chapter 2 and ...
Page 26: ...Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Page 27: ...Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Page 30: ...Documents and Forms Power Squadron recommendations for maintenance and safe boating 2 16 ...
Page 33: ...Documents and Forms 2 19 Spare Parts List ...
Page 34: ...Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Page 35: ...Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Page 36: ...Documents and Forms Notes 2 22 ...
Page 37: ...V2 062012 P N 1035787 Limited Warranty H39 Chapter 3 ...
Page 38: ...This Page Intentionally Left Blank Hunter Limited Warranty 3 2 ...
Page 47: ...V2 062012 P N 1035787 Boating Safety H39 Chapter 4 ...
Page 66: ...Boating Safety 4 20 Notes ...
Page 69: ...V2 062012 P N 1035787 Fuel Systems H39 Chapter 5 ...
Page 75: ...Fig 5 7 A Quick Fuel Filter Reference Fuel Systems 5 7 ...
Page 80: ...Notes Fuel Systems 5 12 ...
Page 82: ...This Page Intentionally Left Blank Fuel Systems 5 14 ...
Page 84: ...This Page Intentionally Left Blank Fuel Systems 5 16 ...
Page 85: ...V2 062012 P N 1035787 Underwater Gear H39 Chapter 6 ...
Page 92: ...Underwater Gear 6 8 Notes ...
Page 94: ...Underwater Gear 6 10 This Page Intentionally Left Blank ...
Page 96: ...Underwater Gear 6 12 This Page Intentionally Left Blank ...
Page 98: ...Underwater Gear 6 14 This Page Intentionally Left Blank ...
Page 99: ...V2 062012 P N 1035787 DC Electric Systems H39 Chapter 7 ...
Page 108: ...DC Electric Systems 7 10 Notes ...
Page 110: ...DC Electric Systems 7 12 This Page Intentionally Left Blank ...
Page 112: ...DC Electric Systems 7 14 This Page Intentionally Left Blank ...
Page 113: ...V2 062012 P N 1035787 AC Electric Systems H39 Chapter 8 ...
Page 120: ...AC Electric Systems 8 8 Notes ...
Page 122: ...AC Electric Systems 8 10 This Intentionally Left Blank ...
Page 124: ...AC Electric Systems 8 12 This Intentionally Left Blank ...
Page 126: ...AC Electric Systems 8 14 This Intentionally Left Blank ...
Page 127: ...V2 062012 P N 1035787 Water Systems H39 Chapter 9 ...
Page 134: ...Water Systems 9 8 This Page Intentionally Left Blank ...
Page 136: ...Water Systems 9 10 This Page Intentionally Left Blank ...
Page 138: ...Water Systems 9 12 This Page Intentionally Left Blank ...
Page 139: ...V2 062012 P N 1035787 Waste Systems H39 Chapter 10 ...
Page 148: ...Waste and Sanitation Systems 10 10 This Page Intentionally Left Blank ...
Page 150: ...Waste and Sanitation Systems 10 12 This Page Intentionally Left Blank ...
Page 152: ...Waste and Sanitation Systems 10 14 This Page Intentionally Left Blank ...
Page 154: ...Waste and Sanitation Systems 10 16 This Page Intentionally Left Blank ...
Page 155: ...Waste and Sanitation Systems 10 17 Notes ...
Page 156: ...Waste and Sanitation Systems 10 18 Notes ...
Page 157: ...V2 062012 P N 1035787 Engines Transmissions H39 Chapter 11 and ...
Page 166: ...Engines and Transmissions 11 10 This Page Intentionally Left Blank ...
Page 167: ...V2 062012 P N 1035787 Sails Rigging H39 Chapter 12 and ...
Page 177: ...Sails and Rigging 12 11 Figure 12 10 Conventional Standing Rigging ...
Page 179: ...Sails and Rigging 12 13 Figure 12 11 Furling Standing Rigging ...
Page 185: ...Sails and Rigging 12 19 Notes ...
Page 186: ...Sails and Rigging 12 20 This Page Intentionally Left Blank ...
Page 187: ...Getting Underway H39 Chapter 13 V2 062012 P N 1035787 DC 041709 P N 1035787 ...
Page 194: ...Getting Underway 13 8 Notes ...
Page 195: ...V2 062012 P N 1035787 Maintenance H39 Chapter 14 ...
Page 208: ...Maintenance 14 14 This Page Intentionally Left Blank ...
Page 209: ...V2 062098 P N 1035787 Glossary H39 Chapter 15 ...
Page 215: ...Notes Glossary 15 7 ...
Page 216: ...Notes Glossary 15 8 ...